Building madman

Chapter 185 Free entry!

Dongshan School of Civil Engineering belongs to the kind of unpretentious, seemingly unfamiliar, but detached old school.

Its origin goes back to the 1950s.

It was at the beginning of the Cold War and the world situation was extremely tense.

In order to resist a possible nuclear war, China has set up a construction department directly under the jurisdiction of Dongshan, a major economic province, to study underground air defense systems and cultivate scientific research personnel in explosion and earthquake prevention.

Later, they were successively merged into majors such as transportation, tunnels, water conservancy, and bridges.

The strong faculty and the strong academic background have created a saying that belongs to that era: Tsinghua Tongji Construction Institute!

However, in the 1960s, the school suffered a devastating blow. Many teachers were living in cowsheds everywhere, and thousands of students also went to the countryside to work in agriculture. Teaching was interrupted for as long as ten years.

It was not until the mid-1970s that Dongshan took into account the development of construction, and then recalled teachers and many students at all levels for reorganization.

It is a pity that the research results accumulated over decades and the various construction techniques imported from the polar bear were all destroyed.

Old researchers have passed away one after another, and most of the rising stars are no longer engaged in the civil engineering industry, and the qualifications and strength of institutions have plummeted.

However, although the fruit is only remaining, it has not been able to shake the transcendent status of the School of Civil Engineering. At least she is still the only higher education institution in Dongshan with professional assessment.

It stands to reason that after the reform and opening up, China's large-scale civil engineering projects should improve the conditions of institutions.

However, Dongshan's development focuses on agriculture and industry, and does not pay much attention to the construction industry. Coupled with the rise of major science colleges in other regions, there is no capital investment, no faculty supplement, and the school of civil engineering has been dying for years.

Therefore, Professor Hu was a little embarrassed when five S600s parked at the gate of'Jifu Second Cotton Factory Dormitory'.

When he founded the Design Institute with Tiancheng, he blew the school to the sky.

What is the only civil engineering in Dongshan, the largest civil engineering in Dongshan, the strongest civil engineering in Dongshan, some and none.

Now I ran over for a stroll...

The Mianchang dormitory used by the school!

It's really big, very wide, and very civil!

Obviously, Ge Xiaotian didn't expect this situation.

He needed talents when he cooperated with the School of Civil Engineering and Engineering. Therefore, after learning about Professor Hu's resume, he did not let Xiao Huang continue to investigate where the school was.

Besides, the dozen or so designers and researchers sent by the other party are indeed very capable...

Thinking of this, Ge Xiaotian smiled.

Yes, what we want is talent!

What happened to the school?

I build it for you!

"Professor Hu, I haven't seen you in a few days, I have lost weight!" Ge Xiaotian directly gave this old friend with real ability a warm hug, and then took the initiative to stretch out his hands and greet the old man beside him, "Hello!"

"Mr. Ge, fortunate to meet you!"

At the same time, Professor Hu returned to his senses and introduced: "This is the principal of our school, Mr. Xu!"

………………

Not to mention that the students were talking about the luxury team, Ge Xiaotian and five school leaders entered the well-arranged conference room.

It seems that the school is very concerned about the new campus, or the two donated teaching buildings.

Unfortunately, this time I talked about the university town, and I don’t know if the other party will agree.

Both sides sit down.

Professor Hu was the first to speak: "Mr. Ge, we actually have an old campus, but the building has been severely damaged and has not yet been repaired..."

"The old campus is your school's business. Let's talk about the new campus today!" When I get older, I will always save face. Ge Xiaotian is unwilling to talk more, so he simply took out a few A4 blank papers from the file bag. "I don't know Mr. Xu and Professor Hu , And gentlemen, have you watched the news last night and today?"

Several people glanced at each other and shook their heads. Professor Hu still replied: "I have been busy applying for a new campus for the past two days. I haven't had time to pay attention to the news."

"Oh? Did you apply?"

Professor Hu shook his head, "It will take time to sell the old campus. Education funds are specially approved by Jifu, and it will take one year or a half. According to the information disclosed by several old friends in the Education Bureau, Jifu is preparing to build Licheng Commercial Street. Funds are tight, and it is estimated that the School of Civil Engineering can only get 5 million for the time being, which is a little bit short of the expected 20 million."

Ge Xiaotian just asked casually and didn't care about the school's funding.

On the way here, he had already thought that instead of collecting a rent of 1.8 million yuan for the'paid use', it was better to sell it to the school as a favor for the'free use'.

After all, in the wilderness, there may not be a school willing to move there.

Moreover, when the university city was founded for the first time, many places were in the experimental stage. The relationship between the two parties was pulled in, and the operation mechanism was continuously improved. This is also conducive to the future development of real estate.

Besides, there is no school, can it be called a university town?

How can I increase my real estate if I can’t get a university town?How to make money?

In a community, even if it only doubles in value, we can earn hundreds of millions!

Is the rent of 1.8 million yuan a thing?

"Lao Xu, Professor Hu, do you have any research on Western university cities?"

"University town?" Those engaged in architecture must have done in-depth research on famous foreign universities, especially old schools. "Northern Europe or North America?"

"It's not the building, but the school operation model!" Until now, Ge Xiaotian was too sleepy and couldn't hold it anymore. Without waiting for the school to answer, he picked up a pencil and laid A4 paper in front of him, "Let’s talk first. Things about the new campus."

"Mr. Ge, we may not be able to provide funds for the construction of the new campus for the time being..."

"It's okay! Professor Hu, how many faculty and students are there now? How many faculties and majors? Is there a library... Forget it! Don’t break or build, isn’t your school planning to use other schools to form Shanjian University?" Ge Xiaotian directly A line was drawn in the middle of the A4 white paper, "Left teaching area, right dormitory entertainment area!"

"Teaching area, full-time standard teaching building..."

The university teaching building is definitely different from the teaching building of Hope Primary School in Sancha Township.

Coupled with the higher prices of Jifu, the number of floors, the appearance...

The average cost should be 200 yuan square meters.

The construction cost is higher than that of Xingyuewan community, but compared with the future Jifu University, which is as high as 1,500 m2, it is not too cheap.

Generally speaking, there is no elevator in the teaching building. There are six floors and each floor is 800 square meters. The shape allows the students of the School of Civil Engineering to participate in the design and submission. It is best to participate in the subsequent construction. The cost should not exceed 900,000.

Come on five!

Next are 20 multimedia classrooms, 20 lecture classrooms, and two university student activity centers...

Ten dormitory buildings, two canteens, two bathhouses, outdoor football field, basketball court, badminton court...

Music room, art room...

Write the data in the A4 newspaper, and then add a little bit and fill in one by one according to the raw material quotation of the city.

Soon, a total budget for the construction of a university that does not include large-scale stadiums and basketball halls was obtained.

Thirty-two million!

If you replace the canteen, bathhouse, music room, and art room with a unique steel structure, you can save almost 5 million.

But if you count the supporting facilities, I'm afraid 60 million won't come!

Ge Xiaotian closed his eyes and thought carefully.

In the first quarter of the millennium, Tiancheng certainly has no funds.

But by the second quarter, it is estimated that there will be a wave.

In other words, work can start in April!

Ge Xiaotian pushed the A4 paper to the school leaders: "Lao Xu, Professor Hu, look, how is this school? Free admission!"