Building madman

Chapter 357 New Way of Working, Frozen Soil Treatment Method

Xu Ling is very clear about her position in Tiancheng.

Not the first secretary, nor the second secretary, but the junior.

But even as a junior, she was very tired.

From morning till night, I almost never stop working, and occasionally I need to stay up late.

Take out the mirror and take a photo, look, it's all gone!

The heavy work convinced Xu Ling that even a super group would not have as much business as its own.

Boss Ge Da seems to know this too, and he has just "cut" and "slimned" the'Tiancheng' again and again.

For example, the development of Tianyu, Tianke, Tiancheng New Energy...

However, Xu Ling discovered that'Tiancheng' is different from meat, the more they cut the less, the more they cut the more!

Divide out Tianyu, and jump up to a bunch of technology companies.

Separate technology, and a group of automobile industries can be formed.

Separate out the car and jump to a Dongshan fifteen city...

Xu Ling never thought that she could not do it, otherwise she would have been dragged away to dig pigsty because of her unskilled business.

The reason why I feel tired is because no one helps her to share the burden.

Tiancheng is no longer a small business.

Even if the structure is different from that of an external company, a "chip", or "integrated business" department, or a secretarial team is needed.

Everyone is responsible for the business of a subsidiary group, summarized here, and submitted to the boss of Ge Da.

Then she had time to drive in the small car Xiu sister bought for herself and go shopping...

Arrived in Amur and got off the plane, Xu Ling thought over and over again, feeling that she should have a bit of a say in Tiancheng.

"boss!"

"Huh?" Ge Xiaotian was looking at the airport lobby, where many people gathered, wondering what they were doing.

"Boss, I need some assistants!"

"We don't have an assistant post."

"No, I mean, I need some secretaries!"

"Student Xu Ling, please recognize your position, you are a secretary, what kind of secretary do you want?"

"I am a big secret, what I need is a little secret!" Thinking of the newly built large commercial plaza in the Canal CBD, Xu Ling decided to fight for it, pretending to be fierce... softly hummed: "Boss!"

Ge Xiaotian stopped and looked at the chubby, indeed capable secretary.

After being dug by Xiao Huang from Lao Qin, he has been working very hard, almost reaching the point of forgetting sleep and food.

As the saying goes, people are forced out, and their potential is cultivated.

On the wall of the secretary's office of the Crescent Office, there were more than a dozen certificates, which he did not ignore.

Such talents who integrate administration and business will not let go of any company.

However, the more perfect the person, the greater the defect.

Well, this is a sentence that Ge Xiaotian has synthesized based on his two time and space experiences.

"Then, I will test you today to see if you can get the Tiancheng secretary post grade certificate!"

"it is good!"

"What do you think is the most important thing in our Tiancheng work?"

Xu Ling was very familiar with her own slogan, and roared without thinking: "Efficiency!"

"The second one?"

"amount……"

In just one second, Ge Xiaotian waved his hand, "You have failed the promotion!"

"..."

"I think Siberia suits you well, stay here to work!"

"I do not want!"

"Be obedient, I'll take you three months off when I go back!"

"..."

Ge Xiaotian smiled, "Xiao Xu, serious and responsible work is an attitude, but attitude is not equal to the way of working."

"I know." Xu Ling was a little unhappy.

"Actually, your work is not that cumbersome. For example, the dozens or hundreds of project progress and various summaries sent by various branches, subsidiaries, and affiliates, you don't need to summarize them one by one!"

"Then I am dereliction of duty!"

"No, you need to change the way!" Ge Xiaotian stepped into the airport lobby and glanced at the lively crowd. It turned out that it was the sister city delegation of Jishi and Amur.

Sit down in an open place and let Dao Er turn on the laptop.

"Xiao Xu, tell me what this is!"

"computer!"

"Yes, what is it used for?"

"Many functions..."

"No, for you, it is an office tool!" Ge Xiaotian opened ERP again, "This software, which I have asked for help in customizing, has been added and expanded one after another. How much efficiency has it improved for our company?"

"Double, no, it should be almost ten times or more!"

"So, you need a software similar to ERP. We have a development team. Why don't you propose the idea of ​​a'secretary assistant'?"

"amount……"

"Think about it, set up a program to bring all the secretaries of the branch together, what can you say directly, do you still need to submit reports and summarize this link?" Ge Xiaotian patted the laptop, "The times have changed! "

"I seem to understand, and I don't seem to understand..."

"Hmm... Just like me, have I asked you for various data?"

"No!"

"Then, what good is it for?"

"amount……"

"To put it another way, you only need to know the progress of the Canal CBD project, when the overall construction will be completed, and which projects can be put into use in advance! Other things are in charge of the project management department, you can't remember if you know it!"

"Understood a little!"

"For another example, make a row of progress bars for the Canal CBD project. Each progress bar corresponds to a sub-project. Which progress bar is full? Which one will you report to me? Others, the progress is 30%, 60%, 90%. When the time comes, make a record separately and estimate the item that can create the most economic benefits, and your work is over!"

"amount……"

"How many projects do we have in total? In addition to the Canal CBD, there are also Jinxiuchuan University Town, Dongshan 15th City, Neoblas, and an officially opened Zaoshi New Town, and a clock-like plan that does not require you to deal with 'For a total of four and a half, how much work can you have?"

Xu Ling's eyes lit up, "So, subsidiaries, branches, and affiliated groups can also use this method?"

"Yes! It's okay to build cars, scientific research, etc.! I call it the "reading article" working method, which is the same as our employee promotion system. It can directly indicate the'project progress' and inspire the staff to be right' The desire for a 100% progress bar is just a piece of software."

"Then I understand the boss, I will find the development team to make it when I go back!"

"No, there is internet, you can do it in Siberia!"

"..."

Ge Xiaotian chuckled happily, waved to the sister city delegation of Jishi city that had been seen in the distance, and walked out of the airport lobby.

And the crowd suddenly boiled.

"Fuck, why is Ge Baiyi here?"

"Are you stupid? Tiancheng has packed 5 million mu of black land here, can he not come here?"

The Bingxiong reception staff next to him shook his head, "No, no, no, Mr. Ge is our distinguished guest, he invested in a city here!"

"???"

"Niu than!"

"No, why do I feel that wherever I go, it is natural?"

"My own person, isn't this good!"

"No wonder Maozi was so polite to us..."

………………

Neoblas.

Ge Xiaotian originally planned to return to Sancha Township before April 25, bringing many grandparents with him to the capital to watch the flag-raising ceremony.

However, both the city construction project and the Gou resources, there are many troubles.

The first is to build a city.

The castle can use system houses, but the functional buildings for water, electricity and heating require normal construction.

In normal construction, it will face the frozen soil layer.

According to environmental changes, soil properties, and survey results of prospectors, the underground soil layer of Neoblas is divided into short-term frozen soil, seasonal frozen soil, and permafrost.

Short-term frozen soil can be replaced.

Seasonally frozen soil can be treated collectively after it has been thawed.

The trouble is the permafrost.

This is the first time Tiancheng has faced this kind of project. It is a test, and it can be considered as accumulating experience. After entering Tibetan areas in the future, this is a rich experience.

The permafrost cannot be replaced and deep excavated, only foundation design can be carried out.

First of all, Tiancheng Construction Department must consider its frost heave and swelling characteristics.

Well, frost heave is not thermal expansion and contraction. It is due to the water in the soil. After freezing, the soil swells and the ground surface is unevenly uplifted.

The principle is that when water freezes at zero degrees, it will increase its volume and squeeze surrounding objects. This is the frost heave force.

Therefore, the construction must take into account that the design principles of the frozen state of the frozen soil foundation mainly include: thick underground ice sections; frozen frozen soil, soil-bearing ice layers and other areas that are strongly thawed and thawed.

Perennial frozen soil does not melt. With short-term surface frozen soil and seasonal frozen soil changes, it will have some reflections. Therefore, the design principles of the melting state of foundation soil should also be considered, including: bedrock section; melting Areas; areas with less icy frozen soil and more icy frozen soils, such as non-thaw settlement and weak thawing settlement; sections of coarse-grained soil with more evenly distributed underground ice layers in ice-rich frozen soil

Based on the above, the foundation types are obtained, such as rigid foundation with cone-face column, rigid foundation with straight-face column, prefabricated foundation...

(They are all special foundations, "cone-face column rigid foundation". The whole is like... a club, a baseball bat, with a thin bottom and a wide top. The main materials include steel, bricks, rubble, sandstone, etc., which are relatively resistant to compression. However, the tensile and shear strengths are not high, so it is necessary to calculate a certain ratio and carry out construction with a prefabricated foundation. As for the prefabricated foundation, this Du Niang has it.)

It is not enough to just make these, but also consider the best start time: September to October!

And the transportation time of materials and prefabs is from November to June of the following year.

Among them, each construction link needs to be carried out in stages...

"It's complicated enough!"

Following the construction workers around the construction site, Ge Xiaotian walked and looked through the construction plan, secretly thanking him that he had studied mathematics, physics and chemistry during this time in order to prepare for the exam.

However, after reading it, he became proud again!

Can this kind of project be done by ordinary enterprises?

When the city is built and returned to China with the money, Tiancheng’s Bigger will put aside other companies just for its reputation.

'I built roads and built cities in Siberia, what have you done?'

President of a real estate company: "..."

However, the construction plan belongs to the plan and requires special construction machinery.

In addition to conventional excavators, loaders, forward and backward shovel loading trucks, breakers, ground drilling machines, mining milling machines, frozen soil milling machines...

This type of machinery is not so high-end, some are like a mace installed on the front end of the machinery, some are like a scratcher that replaces a bucket with a scratcher, and some are like a bucket with a large clamp...

Of course, only the appearance is similar. It is about construction efficiency, size, quality, etc. The structure is definitely different.

As a result, Tiancheng needs to carry out a new round of construction machinery procurement.

Calculating the money in his pocket, all the 70 million Franklin of the Holden Group has been paid.

Satellite projects cost 32 million, and the purchase of aircraft carriers cost 10 million, leaving 28 million.

Machinery is not a consumable, and it will be used in future construction.

Therefore, Ge Xiaotian hesitated, whether to purchase from China or buy wool?

It's still early to the start date, so you can think about it carefully.

After dealing with the construction plan of the frozen soil layer, the trouble of Gou Resources was followed.

With the warming of the weather and the melting of icebergs, mudslides and large avalanches began to appear in the depths of Siberia. In a while, it is estimated that many swamps will form.

Summer is a good thing for the Amur Plain, but it is a bit fatal to the brawny of Gou Zi.

Therefore, the strong man hiding in a ravine in Kolyma has lifted the No. 3 town center out.

Coincidentally, Neoblas needs to build a'castle', and the strong men don't have to rest.

System buildings can be built as long as the land is leveled. Compared to functional buildings such as water, electricity and heating, maybe until the castle is built, construction has not yet started there.

As for why not transform the system building into hydroelectric heating...

How can you master things like construction technology yourself?

And, with so many people staring at it, they have to behave.

Therefore, for the castle project, Ge Xiaotian arranged for the strong men to take turns in the construction, working for one day, resting for two days, and in the third quarter, the construction was completed before September.

However, the No. 3 town center is a first-level unit. If you want to see the castle, you need to use gold to upgrade to the third level.

I called Lao Yang, and he quickly sent the gold necklaces, gold bracelets, etc. he earned from the Internet cafe.

Jingle bell...

After a symphony, Ge Xiaotian suddenly remembered something.

Daoyi, they used realistic technology to forcibly upgrade the technology tree. The third-level town center is almost half a foot into the steam age, or the industrial age.

Look at the construction steam rammers, and steam cranes... These technologies already exist in the smithy and production workshop.

If you use a gas turbine, replace the steam engine...

"Old Hong!!!"

"Hey, boss?"

"walk home!"

"Okay!"

Seeing the two people leaving behind, Xu Ling squinted her eyes blankly and swaggered to put up a middle finger...

What can I do if I find it?

Is there something more bitter cold than this bird not shit?!

………………

On the way back to Amur.

"Boss, it's okay to leave Xiao Xu here?" Lao Hong is older and thinks a lot.

"There are more than two hundred Silver Sky Guards (excellent units), what are you afraid of?"

"I'm afraid she's a girl..."

"Today, the sister city delegation came. There are many lesbians in it, such as agriculture, science and technology, geography, weather and other exchanges. They can be arranged in Neoblas. There is a Tiancheng dining hall, and the food is also suitable. And, the weather It’s getting warmer, and summer will soon be here, and it’s more comfortable than Dongshan. After two months, I believe Student Xu Ling will not be willing to go back!"

"I'm worried...you transferred her back before it was comfortable!"

"Am I like that kind of person?"

"Not like!" Old Hong nodded firmly.

"Go back, you have to rectify your mechanical department!"

"Oh?"

"During this time, I contacted someone with a batch of experimental equipment. The experiment failed. The steam engine was replaced and the gas turbine was ready to be installed. By coincidence, our family really has a large gas turbine!"

"Understood!" Lao Hong nodded, and did not ask to explain the experimental site, "just like refurbishing the abandoned machinery in Daliuzhuang, let them move!"

"Yes, full of energy!"

"Atmosphere!"

The old and the young were twisting happily, the car drove into Amur, just in time to see an old man with a white beard waving at the convoy.

Ge Xiaotian opened the car window, "Hey, sir, why haven't you gotten on the train to Mokos?"

"Haha, we have lived and died together, we can be regarded as the so-called fate of your Huaxia when we meet. Parting is soon, and I will give you a gift!"

"Oh?"

The white-bearded old man pointed to a few large kraft boxes beside him, "This is my treasure for many years, I hope you like it!"

"Really?"

"Yes!" The old white beard finished speaking, waved away, and blinked into another street.

"What a strange old guy!" Ge Xiaotian got out of the car and went to check the kraft carton.

Old Hong looked curious, "Who is he? Is he a strange person like me?"

"Where is your old face?"

"On the face!"

"..."

"Boss, it's a computer!" Dao Er opened the package, revealing a new antique machine with six floors.

Ge Xiaotian narrowed his eyes, and it was exactly the same as the ternary computer at the satellite launch site!

He doesn't believe that Maozi has built a lot of black technology like this.

"This person's identity is extraordinary!"

………………

(I saw an old reader today who said that the plots were compared. Since I couldn't reply to the book review area, I could only reply in the chapter comments. I will take up a dime here to explain.

The fifth chapter is not hostile, most of the chapters are four to five thousand words, and the development of the plot is really scattered.

The whole article can be viewed in this way. Things like technology, car manufacturing, finance, etc., which seem to be irrelevant to architecture, are all foreshadowing. Everything is to create integrated transportation, agriculture, industry, hydropower, and GIS geographic information about urban management. System, or 3S system.

The protagonist’s own planning is not a developer, but a city operator, integrating construction and manufacturing to form a giant that crushes other developers, relying on the suburbs and even the countryside to build one city after another.

Therefore, the alternative GIS geographic information system that the protagonist is preparing to make is very important, and will connect to Xingyue Bay in the future.

In addition, the city of Neoblas is considered a test product before the construction of the Zaoshi New City.

Jinxiuchuan belongs to the university town + racing system.

Canal CBD belongs to integrated industry, technology, finance and commerce.

Daqingshan develops tourism and entertainment.

The clock-like plan is poverty alleviation and promotes the construction of Hope Primary Schools.

For example, Xiangxian, Yunxian, etc., the plot is not much, and it will only occasionally be a foothold, and then it will involve other rural areas and county towns in the future. It will reflect in detail the customs of each area except Dongshan. For the time being Dingnanhe, there may be changes in the future.

The fifth chapter is about to end. The sixth chapter is a rising chapter. The hostile debut, the pace of the plot slows down slightly, and the timeline begins to advance. For example, the protagonist is busy for a few days, and it comes in the blink of an eye...Ancient war movies, such as Lao Hong's What kind of impact does the crazy box have?

I would also like to thank new and old readers for their support and comments here, thank you!)