Building madman

Chapter 577 Tiancheng Standard Tiancheng Speed

Xincheng Xingyuewan.

Ge Xiaotian sent away the leader of Xue Da, and then ushered in supervisors from Dongshan Jifu, Nanhe Zhengfu, Jingcheng and other places.

The other party was not from Tiancheng's side, but was entrusted by the leader of Xue Da to be responsible for the supervision of various projects in the new city Xingyue Bay.

Of course, the other party is very familiar with Tiancheng.

He is a former subordinate of Mr. Liang and an old colleague of Professor Hu.

The scale of the Xincheng Xingyue Bay project was the largest in China before the start of the Wangjing Xingyue Bay project.

Such a huge size also makes the supervisor's work very arduous. It took two days to just be familiar with the construction site.

Immediately afterwards, staff training and drawing review, it took another day.

Fortunately, Tiancheng's construction standards are extremely strict, and they have been widely circulated in the industry as early as last year. By coincidence, China has not issued specific building construction specifications and copied the Tiancheng standards into the interim regulations.

include:

Unified standards for construction quality acceptance of construction projects,

Code for acceptance of construction quality of building foundation engineering,

Specification for construction quality acceptance of concrete structure engineering,

Code for acceptance of construction quality of masonry engineering,

Specification for construction quality acceptance of steel structure engineering,

Specification for construction quality acceptance of wood structure engineering,

Code for acceptance of construction quality of underground waterproofing engineering,

Specification for construction quality acceptance of roofing engineering,

Code for acceptance of construction quality of building ground engineering,

And drainage, decoration, ventilation, air conditioning, electrical, elevator, management, design, material inspection methods, etc.

To sum up, it is four-finger thick paper...

As a supervisor, you must be familiar with the skills of eating. Now when you come to Tiancheng, you are supervising and learning.

So that the supervisory institutes in other areas heard about this, and they also rushed to...

Good guy, everything is familiar now.

After that, in the eyes of everyone's attention, 80 construction departments proceeded in an orderly manner according to the original plan, and began to continue the work during the holiday years ago: the main construction of the first floor.

Build formwork support, tie up wall column reinforcement, carry out beam and slab support, tie beam and slab reinforcement, pre-embed installation pipeline, and finally carry out concrete pouring...

It normally takes 20 days for the whole process to go down, and it only takes 10 days for Tiancheng to rely on self-developed cement and special equipment.

Subsequently.

The construction of the main structure of the first and second floors of nearly 150 buildings has begun.

The steps are similar to the construction on the first floor, but Tiancheng uses a climbing frame for the first time.(Dust net has been used in the previous article)

The climbing frame is also called the lifting frame. The whole body is made up of guide rails, vertical keels, rigid walkway plates, trusses, rigid triangle brackets, and horizontal connecting plates connected by bolts.

There are also anti-falling systems, climbing systems relying on hydraulic devices or electric hoists, and construction protection systems.

It is a new type of construction work platform that reduces or replaces scaffolding. It can effectively reduce steel consumption and greatly protect the safety of construction workers.

In 2001, neither China nor overseas had promoted this equipment.

Tiancheng developed a new type of scaffolding system by relying on steel structure and mechanical technology, which also obtained a patent.

The construction of the low one and two floors does not need to be lifted by a hydraulic device, and the supervisors do not understand the effect of this stuff.

But after twenty days...

February 17.

More than one hundred and fifty climbing frames, in the incredible gaze of the supervisors, slowly rose, opening the construction of the main structure of 3 to 26 floors, or 3 to 32 floors.

At this point, Tiancheng Engineering Department began to show off!

Relying on a complete supply of logistical materials, one day of construction, two days of maintenance, three days of one floor, climbing up identifiable by the naked eye...

During the maintenance period, large groups of troops moved to the northern foothills and laid tracks around the mountain.

Another part of the staff beautify the banks of the Panlong River.

Next.

If you take a video camera to record the construction site of Xincheng Xingyue Bay and play it quickly, Tiancheng employees are like Popeyes eating spinach...

Hush, get into the building, clanging, finish the pouring construction.

Hey, during the conservation period, head straight to the northern mountains and start quarrying.

Shoo, the maintenance is complete, raise the climbing frame and continue pouring.

Shoo, transport gravel, and pave roads outside the construction site.

Hey, Panlonghe is getting more and more beautiful...

Old Shen was already shocked.

In the past month and a half, he has hardly left the construction site, just sitting in the hall, sipping tea, and watching Tiancheng hundreds of tall buildings rise on the ground...

And looking back at home again.

Tiancheng had a holiday a year ago, but Dongshan Jianlian did not have a holiday. They worked overtime and built the floor to the eleventh floor in three months, half way to the ceiling.

I originally wanted to throw away a big part of the sky, but now I take a look...

Will be surpassed soon!

Thinking of this, Old Shen couldn't sit still, and contacted Wei Changfeng anxiously.

Well, these two people are true allies.

Satellite phone connection:

"Old Wei, you have to help me, the first batch of 100,000 people to migrate in the old city of Zao City, Tiancheng Xingyuewan can swallow half! We really don’t want to speed up the Ginza community anymore. Once Tiancheng’s real estate is on sale, it will turn to Entering the second phase of the project, who will buy my real estate? I am finished, Tiancheng and Tianhao will work together to engage you, can you resist it?"

"Old Shen, it's hard for me too! Chen Feng of Gouri ran to my hometown to start New Commodity International. I don't know where he got so much capital. He also has good relations with several super fruit merchants in Guang District and Xiangjiang. People unite together, that's just pressing me to fight!"

"..."

"Old Shen, I'm not shitting, I'll take a picture of you, look, I've lost another fifty catties, and my body is not as big as Ding Hao's fat black man!"

"..."

Shen Zhipeng rubbed his eyebrows, "Anyway, even if you give up the Nanhe market, which is stalemate with Tianhao, you have to help me. As long as I resist and sell Zaoshi Xincheng Ginza, we can transfer the funds to Beihe, where we are cooperating. project."

"I understand...then, I will find a way to get out and support Ginza, Zaoshi New Town!"

"ASAP!"

Old Shen picked up the telescope with a sad face and continued to observe Xingyue Bay in the new city of Zao City.

The scaffold, which was wrapped in a protective net and green in autumn, began to move upward once...

and many more!

Old Shen rubbed his eyes and suddenly saw that more than 150 buildings in Tiancheng were actually installing construction elevators...

What do you mean?

Isn’t it necessary to follow the construction of the elevator after half-building?

how……

Without waiting for the old Shen to resolve his doubts in his happiness, Tiancheng employees began to move the exhaust ducts in the bathroom and kitchen...

"???"

With doubts, Shen Zhipeng waited and watched for two days.

Then found...

The Tiancheng building reached the sixth floor, and construction of block and secondary structure began!

(No 17 floors can be used for building blocks in 2001.)

Familiar Tiancheng employees rely on the engineering elevator after finishing the runway and the summit corridor.

Carry out water-stop formwork and concrete pouring for toilets and air-conditioning panels,

Plant reinforcement and masonry for window sill top pressure, etc.

Reinforcing steel bars, formwork and concrete pouring of concrete components...

"This is too fast, right?" Old Shen saw his scalp numb.

However, Tiancheng's god operation is still not over.

When the building reached the eighth floor and the blocks progressed to the third floor, thick smoke billowed from the Tiancheng construction site, which lasted until noon the next day, which coincided with the time of the first two construction and maintenance.

(After the blocks are poured, they are cured by steam at 60°C for 17 hours to achieve the early strength of the concrete and shorten the curing time. Incheon Bridge also uses this technology, so a piece of precast beam can be produced in two days.)

When the dense fog dissipated, the building proceeded to the ninth floor and the blocks proceeded to the fourth floor...

Why did you start an energy-saving project again?

Later, during the maintenance period, Tiancheng employees processed the first floor of the inner and outer walls of each building, nailed steel mesh at the junction of different materials, and then watered, shot grouted, dotted, reinforced, layered plastering, and corner protection. , Baokou, maintenance...

Plastering internal and external walls?

Shen Zhipeng trembled, and rushed straight into the Tiancheng construction site to find someone wearing a red hat.

"Ge Lao Er, if you can put on tiles tomorrow, my old Shen will do it with you from now on!"

"What are you doing? The construction of the upper level hasn't ended yet, so I am putting tiles now. What if the tile master is hit by debris? Besides, if you want to do it with me, I won't accept it!"

"..."

Shen Zhipeng ignored someone’s ridicule, stared at the Tiancheng construction site carefully, and even stood on tiptoe in order to be more careful...

Ge Xiaotian was happy and waved, "Drag him away for me!"

"Don't, I'll just see..."

"What are you doing!"

"Brother Ge, teach me, I will give you money!"

"Oh? Give money?"

Ge Xiaotian raised his eyebrows, walked into the temporary office, and asked people to serve tea, "What do you want to learn, hurry up, tomorrow 312 Arbor Day, you should also receive the invitation from the leaders, I am going to rest early and rush early tomorrow past."

"No hurry, no hurry!"

Shen Zhipeng stood at the door and continued to look at the'climbing frame', "What is this?"

"A kind of CNC hydraulic climbing device, self-developed by Tianji, high quality and low price!"

"How much is a set?"

"This is a Tiancheng patent, the company does not pass on the secret, you and I are in a competitive relationship, do you think this price?"

"One hundred thousand set!"

"One hundred thousand?!" Ge Xiaotian couldn't help but shout out.

Climbing frames are basically sold by ton, following the fluctuation of steel prices, including processing fees and hydraulic devices, or changing to electric hoists, the cost is about 3 times the price of steel, plus a climbing frame safety net of 20 or 30 yuan per square meter , The price is about 4 to 8 times that of steel.

A set of conventional climbing frame weighs 2 tons, and the cost is only 5,000 yuan.

And it does not have much technical content, that is, steel pipe and steel plate plus a transmission system, which promotes the overall scaffolding to climb up.

People in this era do not use it, mainly because there are few high-rise buildings, and many time-saving techniques have not yet been realized.

After waiting for three or two years, infrastructure construction has exploded, various construction methods are emerging one after another, and the climbing frame will soon become a conventional device.

After the completion of the new city of Xingyue Bay, the second phase will need to be delayed for one year before proceeding. Leave this thing in your hands and it will soon rust.

If it is transported to Nanhe or Wangjing, its own value is not as good as the transportation fee, and it is a pity to lose it...

That's why he just said that it is good quality and cheap.

One hundred thousand, very profitable!

Sell ​​one old set, buy ten new ones!

Shen Zhipeng watched Ge Xiaotian fall into silence, "Don't be silent, like this, 150,000!"

"???"

"Two hundred thousand? That's a bit expensive."

"..."