Chaoshen Technology Trading Mall

Chapter 326, big thrust, vortex engine test flight

It is also because 929 is still in research and development, so actually Wang Bin's test flying objects of their engines have only the large transport planes of the military.

However, in fact, there are still many models that the military can choose from. In addition to the 20th transport planes that Huaxians themselves, they also come from the 76-large-scale military and civilian transporter of the Arctic country, as for the transformation of civil aviation Large passenger plane, Wang Bin still doesn't have this intention.

In other words, it is actually only two of the test flying objects selected by Wang Bin.

Thinking of this, Wang Bin no longer thinks more. After all, this is not he can choose, but to see the military want to use the aircraft as a test flight, but Wang Bin's heart still has a certain premonition, army It is very likely to use Huaxia's number 20 transport aircraft as a test flight.

However, Wang Bin felt impossible, after all, the number of 20 transport machines now produced is very preferred, so it is impossible to install the S003 vortex engine to verify the test flight, so the object that may be flying, or from The 76 airplane of the Arctic country.

However, in a few days, when Wang Bin, when Wang Bin, I was in a hurry, Wang Bin expected the test machine finally came, and this time to install Tiangong Technology this S003-type vortex engine plane It is not the top 76 transport plane before Wang Bin, but a complete domestic 20 transport plane.

This makes Wang Bin very unexpected, after all, this plane is not a lot of Huaxia military himself, even if you use it is not enough, you will have a test flight of S003 vortegee engines for their Tiangong Technology. .

"Qiu Group! I can't think of you, I will use the 20 plane to take the flight. Do you worry about what is unexpected?" When the plane stopped at the airport runway today, Qiu Tuan and aircraft crew and several technicians When I came down from the machine, Wang Bin was very unexpectedly said to Qiu Tuan.

"Total Wang! Originally, we are also preparing to use 76 airplanes to verify the test flight, but considering the 76 airplane is not a domestic plane, and its design period is already a bit long, the most important is a lot of core data for the plane, We have not fully understood thorough, so we use the 76 transport machine to verify the test flight, the risk is still very high.

However, this 20-year transport machine is different. Because this plane is completely designed manufactured by our own, all data properties of this plane know all the classes, so compared to the 76 transport plane. If you verify the test flight, the risk of using the No. 20 plane is much smaller.

Most importantly, now our 20th aircraft, although it has entered the mass production phase, and specializes in domestic connotations made to this plane, has also entered a small scale production stage.

However, its capacity is still very limited, which greatly restricts the production speed of this plane, even from abroad, some big thrust, more than vortex engines, but it is still not enough.

There is also, whether we have entered a small-scale massive scroll engine, or from the engine imported from the Arctic country, there are some problems, after all, people will sell to Wang Bin, the most advanced engine is sold to Wang Bin. At the same time, in terms of price, it is even more free.

So we simply took this plane as the test flight of this test flight, as long as the engine of Tiangong Technology can successfully test flight, and the data arrived in your expected demand, this will greatly reduce our aircraft Pressure in the engine.

At that time, the capacity of this plane will greatly improve, and it is taking into account these, we will use this aircraft to test flight.

At the same time, in order to ensure the installation and the state of the aircraft, we also specially invited the manufacturers of this plane to send multiple technicians to work together to install the engine. "Qiu Tuan said.

With the arrival of this 20-shipment, Wang Bin naturally began to remove the original engine for this plane, and install new engines. At the same time, due to the original installation of this plane, it is a big thrust. The intensity of the turbine engine and the engine rigging and the strength of the wing are also very sufficient, so that the aircraft does not need to be installed on the No. 9 plane before, it must first take the plane itself. Improve.

And, since this plane is the latest transporter of China's independent research and development, even if Wang Bin's Tiangong Technology wants to have ideas for this plane, the military is absolutely not allowed.

It is also at least simple to replace the engine, just for three days, Wang Bin has completed the replacement project for the four engines of this plane.

After the installation completed these engines, these technicians brought by Wang Wangbin also conducted a comprehensive examination of this aircraft and confirmed that there was no problem, it began to test the plane.

As the flight of this plane began, the engine of this plane naturally was quickly noticed. After all, it was very much for this plane concerned, although it was a few years since this plane came out. But there are still many people who are paying attention to this plane.

So, between the entire network, there was a 20-plane plane that was trial flight.

At the same time, many news media on the Internet have even reported this matter even even the official news.

"God! What I found, the 20 transport plane actually replaced the engine, and the diameter of this vortex engine seems to be much larger than before, while flying, the sound sent from this engine It also seems to be smaller, I don't know how the performance of this engine is. "

"Yeah! But for the manufacturer of this engine, I still know some. After all, the engine hood is obviously the words and trademarks of Tiangong Technology, so it is clear that this engine is definitely Tiangong Technology. Type product. "

"No! This engine is really a product of Tiangong Technology. I just went to the official website of Tiangong Technology. I found that this is really the engine developed by Tiangong Technology, and some of the engine basic data."

"Yes! I also saw that according to Tiangong Technology's data shows that the model of this engine is TG-S003 vortex engine, and this engine has a very long life, the first rework time can at least 15,000 Hours, the full life of the engine can be at least 45,000 hours.

At the same time, the thrust of this engine is also very large, reaching an amazing more than 30 tons, although the official website does not announce the specific data of the engine, but according to the data released by the data, this can be speculated The thrust of the engine is at least 31 to 32 tons.

If these are true, then, as Tiangong Technology has said, the performance of this engine has reached the level of the international top engine. "