Chaoshen Technology Trading Mall

Chapter 367, the first aircraft design completed

When everyone finds me suddenly, Wang Bin not only thinks, it is better, and most of the parts of Tiangong technology are manufactured by themselves. Even if it is needed to process industry, it is also provided by themselves. And those outer processing products, just need to help the processing, even if it is a screw or nut, it is also possible.

At the same time, in the quality inspection, Tiangong Technology is also very strict. In addition to entering Tiangong Technology, the parts requires the quality inspection department to monitor, and the quality inspection person in the workshop is also required to check the quality inspectors in the workshop. At the time of assembly, the assembly personnel, or to monitor it, it is the case that the quality of Tiangong Technology products is guaranteed.

.......

The crash of the new rebuilding sixth fighters, the superior is very angry, after all, this thing is originally avoided, but such a major accident has happened, which directly leads to multiple departments of the manufacturer of this plane. Including the purchase department, the Quality Inspection Department, and the manufacturers have been severely punished, and there is also a plurality of design sectors of this aircraft.

Of course, for this matter, Wang Bin is not very clear, because Wang Bin has been a professor and others after finding the cause of this plane, and returned to Tiangong Technology.

On the second day after returning, Wang Bin received a call from Qiu Shi from Beixing. In the phone, Qiu Shi told Wang Bin from the reasons of this accident.

And let Wang Bin who have the process of manufacturing the engine and the airlines after the development of Tiangong Technology, must put the quality and safety of the product in the first place.

With the end of this matter, Wang Bin put his energy back to Tiangong Technology, because after Wang Bin came back, Tiangong Technology has been in the nearly one year, the first shelf The fixed wing manner finally completed the design and the manufacturing of parts, and truly entered the premium stage.

"Total Wang! Our first aircraft of our Tiangong Technology, is also the design of Phoenix -1 aircraft and parts manufacturing and completion, and we have also started in terms of airplane keel," just Wang Bin returned to Tiangong In less than one week, Professor Dai came to Wang Bin's office and said to Wang Bin.

"What? The first plane of our Tiangong Technology has begun, let's take a look." He heard the professor of Dai, Wang Bin couldn't help but excited, this is designed by them. The first truly aircraft is very important for their Tiangong Technology, but it is very important.

Most importantly, this phoenix -1 transporter is not a general transport machine! Although the transport machine still has a lot of defects, this transporter does not only have the function of ordinary transport, but also has a bomber function, so you can implement multiple tasks, including the transportation and execution of personnel equipment. Tactical bombing mission against the enemy.

So Wang Bin immediately notified the professor and Zhang Professor Zhang and others. After waiting for the Wang Bin from them, Wang Bin immediately and poke professor and others, couldn't wait to come to the newly built aircraft assembly of their Tiangong Technology. The workshop began the manufacturing of Tiangong Technology's first carrier.

Into the aircraft manufacturing workshop, Wang Bin saw this huge workshop, not only very comfortable.

After all, in order to build this workshop, they have spent a lot of time and effort.

This workshop is 50 meters high, and the long width has reached more than 150 meters. It is absolutely full of various aircraft manufacturing, even now the world's largest aircraft, 225, there is absolutely no problem.

When Wang Bin and a professor, after entering this workshop, first seeing is naturally a buzzard, and that huge aircraft skeleton.

That's right, this skeleton is the first aircraft of their Tiangong Technology will be manufactured.

And the situation of this plane, at this time, the skeleton has been basically completed, and the next will be the various components of the aircraft and the skin of the aircraft.

At the same time, in Tiangong Technology, whether it is the design department of this plane or a professor and other objectives related to the plane, it is confidence in this plane.

And, for this non-motorized naming, Wang Bin is also prepared to continue the model before the plane has not improved, which is the name of Donald, "Phoenix-1" type ultrasonic transporter.

That's right, they are still a small plane, but a middle transporter, but still an ultrasonic express transport.

According to the design data, this aircraft will be equipped with two TG-WSX1-type engines as the power output of the aircraft.

At the same time, the body of this plane is not like a general transport plane, using the upper single-wing design, but uses the design of the medium-single-wing, and adopts the wing fusion than the moving wing is close to the body. the design of.

In addition, the fuselage of the aircraft is slightly long, and the traveler of the aircraft wing is also the same as the ordinary ultrasonic airplane, relatively large.

At the same time, since this plane is the first aircraft designed by their Tiangong Technology, this aircraft did not use a variable-wing design for safety.

Phoenix -1 airplane final design parameters:

Wings show 29.70 meters

45.3 meters long

13.67 meters high

After the wing, the corner (outside) is 45.5 °

Airweight 28 tons

Normal takeoff weight 80 tons

Maximum takeoff weight 88 tons

Maximum capacity 30 tons

Maximum fuel consumption of 30 tons

The maximum length of the warehouse is 20 meters

The maximum width of the warehouse is 2.6 meters

The maximum height of the warehouse is 2.3 meters

Maximum flight speed 1.8 Mach

Cruise speed 1.1 Mach

Practical upgrade of 19,500 meters

Sea level climbing 109.7 mccond

Take a shot of 1200 meters

1500 meters from landed slide

Maximum voyage 5100 km

According to data, this phoenix is ​​aircraft, in many people, including many people in Tiangong Technology, is already very good, whether it is the maximum flight speed of the plane, or on the maximum flight height.

But this plane is actually unable to reach the extent of Wang Bin's heart, but since it is the first manned plane design and manufactured by Tiangong Technology, Wang Bin also knows that it cannot be required to be too high.

What's more, and other transport aircraft, this plane also has its own flaws, first of all, as a transport machine, this phoenix number is too small, unable to carry the heavy equipment, such as medium heavy equipment Tanks, even if there is a light tank, there are only a few portions that can be carried.

Secondly, Wang Bin seems to be too short, because according to Wang Bin's idea, this aircraft is at least six thousand kilometers or more, but the aircraft is only five A thousand kilometers.

Finally, in terms of the speed of the aircraft, according to Wang Bin's expectations, at least two two standards have been achieved, that is, two macher and 20,000 meters, but this plane is not reached.