Chaoshen Technology Trading Mall

Chapter 409 Efficiency

When Wang Bin test completed the data of the system, Wang Bin was very satisfied with this intelligent system after the smart system was understood.

Of course, in the process of detecting this system, as the technicians who know the development of today's computer development, they are not so calm.

After all, this system, for them, it is amazing, let me not say the intelligence of this system, which has far exceeded the technology level of human civilization now, just as this system is used. Programming is rough ancient Chinese programming, it is enough to surprise them.

Of course, they don't know, they can see, in fact, only the least important things, those that are really important, they can't see it.

At the same time, the programming they see is just the most primary ancient Chinese programming. As for more advanced programming, it is the middle and senior programming, Wang Bin does not let them see, after all, compared to primary programming, medium and advanced The programming has a greater role, even even this system is also made by middle and advanced programming.

That is, as long as you understand the middle and advanced programming, if you give the time, you can definitely write a smart program that far exceeds the level of human civilization technology. Once this set of procedures leaked out, it is definitely not the human civilization. Good thing.

Therefore, Wang Bin did not have a high-level programming, after all, this programmed primary programming is very powerful, absolutely enough to use human civilization.

With the superior success of Tiangong Technology, this intelligent system is installed, and the various departments of Tiangong Technology and the personnel allocated each permissions, Wang Bin, their Tiangong Technology, whether it is managed, or in research In terms of a step.

Especially in scientific research and production, it is more efficient than ten times before the aid of intelligent systems.

It is to know that Tiangong Technology, such as today's production workshop, its automation level is very high, so many automation production equipment in many workshops can be used to operate.

Therefore, the overtime of Tiangong Technology, after installing the artificial intelligence system, not only the production efficiency is increased, but even in the quality of the product, it has also greatly enhanced.

For the aviation engine of Tiantong Technology, the production capacity of the original month is about 300, but after the artificial smart program take over these automation production equipment, if the production equipment is produced, its production efficiency is absolutely More than 1,000 units per month.

As for scientific research, don't say, after all, any research is needed to have a lot of data calculations, and the more large research projects, the calculated data required, especially the research and development like Hang Duty. This is even more.

So at this time, it is necessary to overtuine to calculate, and its technical performance is also the speed of technology, the greater the help from scientific research. And the existence of artificial intelligence has greatly enhanced calculation efficiency. Naturally, it can also have a great accelerated research and development efficiency.

Take Wang Bin, the latest Tiangong-6 heavy rockets that they Tiangong Technology, who are developing, the original technology will be expected to develop this rocket in half a year.

However, since Tiangong Technology updated the overtinent system, its research and development efficiency has been directly greatly improved. It is expected to develop successful rockets at least three months.

Now just in the past is less than two months, the design work of this rocket has been completed, and it can now enter the manufacturing stage.

And due to the factory equipment, many are directly controlled by the oversupply smart system, so the speed is also very fast in the manufacturing, and it is expected that as long as 20 days of time, this Tiangong-Six rocket can be assembled.

As for the previous Tiangong -5 type 2000-ton rocket, it has been manufactured in success and has been reached around 40 tons, which is affiliated to the official rail spacecraft. Space orbit.

Therefore, after the overtime has been in hand, the R & D speed of its entire Tiangong Technology is directly greatly improved.

Moreover, this is not only the head of the company, but also other branches of Tiangong Technology, even the Tianyuan Optics of Civil Products and Tiangong Special Materials Co., Ltd., which has obvious in terms of research and development of new products. Acceleration.

As for the shipyard, don't say, in terms of ship's designers and manufacturing, the speed has greatly improved.

In the construction of the new ship, its work is shortened, and the design of the new 10,000-ton warship has also been significantly improved. It is expected to be designed for about a year or so, but now according to the shipyard design department. Feedback, only need for half a year, you can complete the design.

.......

Tiangong Technology.

In the aircraft assembly area of ​​Tiangong Technology, there are five or six huge factory buildings in construction, and these factory buildings have exceeded 500 meters compared to a huge, largest plant, and their growth has exceeded 500 meters. It can be called The veritable giant.

Although most of these factory buildings are still built, there are two buildings that have been completed, and these two factory buildings are the first and second aircraft assembly workshops of Tiangong Technology.

Of course, if it is reasonable, the previous aircraft assembly work is also the first aircraft assembly work. It is already enough to use the current use of Tiangong. After all, the area of ​​the first assembly workshop is not small, and there is also one hundred meters long and wide. .

But for Wang Bin or Tiangong Technology, only one Aircraft assembly work is still not enough, not to mention in Wang Bin's expectations, after the first workshop, in fact, it is only used to create more than 150 tons s plane.

A larger plane, such as aircraft below more than 500 tons or more, Wang Bin is not prepared to be manufactured in the first aircraft assembly workshop, but is ready to be manufactured in two workshops.

And the plane below 500 tons is ready to be manufactured in the third workshop. Of course, all this is just Wang Bin's intention, after all, now Tiangong Technology's aircraft assembly workshop, only two more.

Within the 1st aircraft assembly, at this time, the five Phoenix No. 1 aircraft is carrying nervous assembly, and these aircraft, some have just started laying keel, and some have been assembled, how long does it take? 1 airplane can be offline.

Yes, as the Phoenix-1 plane produced by Tiangong Technology has passed many times after multiple test flights, this plane has also initially obtained the military recognition, and has already given them to Tiangong Technology, it will be issued. The first batch of orders, so, at this time, Tiantong Technology Phoenix -1 aircraft has entered a small batch of production.