The next morning, I finished various things in the morning as if nothing had happened.
There was nothing unusual about Karen's condition either.Even if the purpose was to dive in, even if they found out they were diving in,
"Huhahaha! Yes! I was going to dive in here!"
"What, what!?"
I don't think so.Either way, there's another week or so.After that, Karen decided to leave.I need to think about what I'm going to do then.
I kick it out of my head for a moment.Starting today, it's time to make a mackerel and pull the water from the source.With the tools lined up outside the house, Krul, Lucy, and our family, including Hayate, headed for the hot springs.
A hot spring that gushes out of the water.When we all went to check the drainage pond gently, the forest hot springs were still frequented by thousands of people today, and they felt a continuous shock on their shoulders.
It's kind of impossible to do construction here, isn't it?
What a surprise.
When I say it, Diana, who was shocking her shoulder, puts her hand on her cheek and says:
I think it's something that will come back eventually just by being away for a while, but it's not my intention to surprise you.
Fortunately, there is a distance from the source spring to the drainage pond, and the drainage side from the bathhouse should be connected to the ditch there.
When I suggested to my family what to do with it, it was said that it might not be a problem, so I decided to proceed with it.The drainage side can be slightly accommodated later, so if it is difficult, it should be renovated.
Well then, let's split up and move on.
Ohh!
Thus, the final process of the bathing hall began.
The work is divided into a group that makes a bowl, a group that builds a pillar to support it, and a group that digs a drainage ditch from the drainage bowl of the bathhouse.
It was me and Riquet who made the bowl.Helen and Diana dig the drains.Everyone else, including Krull, was setting up their pillars.
Anne was turned into a strut, not a drain, because she was tall, but if there's anything you can do about Karen, then so be it.
Riquet and I cut the logs out of the logs.The logs quickly changed into long planks because of the work that had been done.
The wooden planks are combined in a concave shape to form a reed.Even if some water leakage is unavoidable, it is basically assembled by combing so as to reduce it as much as possible.
At that time, it will expand slightly if water is included, so it is necessary to take that amount into account in the calculation.If you put it together with too much stiffness at the assembly stage, there may be a problem when it expands.
That said, if it's too loose, the water will leak, so we need to do it in just the right place...... but I'm a cheat, and Riquet makes up for it with experience, and quickly assembles it.
At the beginning of drawing water from the source spring, you need a branch so that you do not go to the bathhouse with a small board, so you can also make it.When cleaning or something like that, I turn off the water before using it.
Looking at the direction of the struts in between the work, they were progressing at a fairly fast speed.The bathing area is a bit far from here (because it is too far from the house if it is too close to the source spring), so it seems that the leafless trees are growing regularly.
As for the width, I have handed over a piece of wood with the same width as the bottom of the bamboo, so I have it accordingly.
Eventually, the bamboo shoots assembled here will carry the water to the bathing hall.
And the water accumulates in the tub, and it heals us, as the animals in the forest do in the drainage pond now.
I returned to the task of making a centipede while looking ahead at the pillars lining up for such a sight.