For example, the country's most important various engine projects have all achieved breakthroughs due to various high-performance materials provided by Infinite Gravity Group!

All the "heart diseases" of various fighters and big planes are cured!This alone will greatly increase the influence of Infinite Gravity Group!

Not to mention those "peace couriers", after using new materials, not only the amount of bombs has become greater, but also a qualitative breakthrough in flight speed and flexibility!

It can bring'peace' to the enemy more quickly, and break through the enemy's defense network faster and more unstoppable!

There are also various upgrade and transformation projects of nuclear submarines, all of which are related to the various batteries and materials of the Infinite Gravity Group. All these influences may not be understood by ordinary people, but they do exist.

These hidden influences are also one of the reasons why Infinite Gravity Group can smoothly carry out various cooperation with the country, such as the Hadron Collider project, the rocket project, etc., because of this influence, all the way through the green light of.

Not to mention the recent application of nuclear fusion energy development projects that have been approved. For sensitive projects such as nuclear fusion energy, if ordinary companies apply for approval, the country will only treat you as a joke.

And after the application of Infinite Gravity Group, it immediately became a focused project because the country knew that their company was indeed likely to solve this problem.

Such a great influence is the reason why the company has always been so confident, that is, everyone knows that as long as it does not die, the country is the company's biggest backing!

Want to add pressure to trouble the Infinite Gravity Group?A source of confidence in the company's tough and domineering response is also provided by these influences.

The company's headquarters is not affected by this incident, and the company employees at the South Island'Gaia' rocket launch base, thousands of miles away, will not be affected.

They will be busy and crazy during this time, even if they know the company's disturbances, they are not concerned about it. It is really their job that is too important.

The two space telescopes and the three synchronous orbit satellites have all been shipped to the launch base, where they will be finally tested.

Although the rocket's first-class engines have passed the launch test, they still need to undergo a comprehensive test before they can meet the launch requirements again.

Not to mention the two-stage rocket, and the system test after the integration of the two-stage rocket, such as the separation of the first and second stage rockets, the separation of the fairing, the ignition of the second stage rocket, etc., all of which have to go through many simulation tests. of.

Of course, there are many other tests and monitoring work that need to be carried out simultaneously. To complete the successful launch of these five carriers into space according to the scheduled launch plan, there are too many things to do !

The launch preparation of the launch vehicle involves a wide range. It includes the inspection, testing, transfer, propellant filling, calculation and binding of launch procedures and data, ignition and launch, tracking and measurement, safety control, measurement and control communication, and ground service support. Waiting for many aspects of work.

As everyone already knows, the launch vehicle launch site is generally composed of major departments such as the technical preparation area, launch area, command and control center, measurement and control communication system, and ground service support system.When the launch vehicle arrived at the launch site from the manufacturing plant, the launch preparations of various departments began to be fully launched.

The launch vehicle first entered the special workshop in the technical preparation zone.Here, the instruments and equipment on the arrows are tested individually to check their performance and accurately measure their parameters.

After the unit test is qualified, the sub-system test is performed. It is to check the coordination and function of the work of various instruments and equipment in the system while the system is in working state, and measure its working parameters.Next, a matching test is performed between the various sub-systems to check whether the work between the systems is coordinated and matched.

Finally, a general inspection is carried out for all systems on the arrow. The general inspection is usually carried out multiple times to simulate various flight conditions to verify the technical performance and reliability of the entire system of the launch vehicle and to make the rocket meet the requirements of the launch state.

After the general inspection, all kinds of pyrotechnic devices and pyrotechnic devices were installed on the launch vehicle, and they were ready to transfer.

While carrying out technical tests on the launch vehicle and the spacecraft, the measurement and control communication system in the launching site shall undergo joint equipment testing.First, conduct a joint test of the equipment in the field, and then conduct joint tests with the measurement and control stations, measurement and control centers, and measurement ship equipment distributed throughout the country, even the world, and on the ocean.

At the same time, the ground service support department commissioned the launching equipment and filling equipment; the meteorological support department opened the weather information network and the weather consultation network, started the meteorological measurement radar, and began to make long-, medium-, and short-term weather forecasts.

With so much testing and preparation work, the company's attention has been focused here during this time. As for the conflicts with those companies and countries that are coveting the company's artificial intelligence system, there are not many people concerned.

After all, everyone knows that their company will never lose money in such a thing. The facts have proved this. Instead of caring about this, it is better to care about the company's 5 consecutive rockets!

Rocket Lab's Xiong Antai and Deep Space Lab's Zhang Hanxiu were all nailed to the launch base during this time, and the people in the two laboratories were pulled over except for those who had to stay to continue the experiment. !

This launch mission is the most important beginning of the company's space program. If all the payloads are successfully launched, it proves that the company has mastered the rocket launch and recovery technology!

This will be of great help to the company's ongoing research and development of heavy carrier rockets and space stations and other projects, at least it can prove that the company really has the confidence to carry out so many projects!

Now everyone is so nervous because this series of launch missions will be a solid cornerstone of the company's space program.

If there is a problem with the launch, the various space programs behind the company will inevitably be affected, which will make the company's researchers deeply hit!

So now everyone at the'Gaia' rocket launch base is fully dedicated to these pre-launch testing and monitoring projects.

Of course, because of the cooperation with the national aerospace department, there are also many experts from the aerospace department here to help. Their rich rocket launching experience is very helpful to the infinite gravity group!