I have a little black hole

Chapter 552 Officially Begins the Construction of a Nuclear Fusion Power Station!

Not only did the country think so, even if the energy companies did not give up the nuclear fusion reactor technology of several other routes, the people in the laboratory conducted preliminary research and discussion on those technologies, but at this stage they still use The technology provided by this boss is mainly.

Thousands of birds are better than a bird in the hand. There is already a commercially available nuclear fusion reactor technology. Of course, we must first stick to this technology, and deepen the potential to continue in-depth research and development is the infinite gravity group. Things.

As for the technology of other routes, keep paying attention and discussing, so that your knowledge reserve is not behind. Of course, some basic research and design work can also be done at the same time, but it cannot be the mainstream.

And the country here has already passed the application for the construction of the experimental reactor of the company's nuclear fusion reactor for the first time, so the energy company will of course start construction immediately!

It is an experimental reactor. In fact, the scale of the nuclear fusion reactor that Lei Tiantang arranged for the energy company is based on the demonstration reactor. The requirement is that it can be directly connected to the power supply after commissioning after completion.

After all, even if the real experimental reactor has been built, the nuclear fusion reactor at the seabed base is the real experimental reactor. It has been operating steadily there for several months. So far, all the performance indicators have fully met the design standards. With this confidence, it would be a waste of time to repeat the construction of a small-scale nuclear fusion experimental reactor.

So even if the application is for the construction of an experimental reactor, both the design scale and the design of supporting facilities are designed according to the scale of a regular nuclear fusion reactor power plant.

In this regard, although the experts and the country of the audit team know this, but everyone has not stopped it. Since the infinite gravity group dares to do so, it must be very confident in its own technology.

And it is good for the country to do so. If it is built according to the demonstration reactor, as long as there is no problem, it can help the country save at least half a year of technical observation time. This is not only good for the infinite gravity group, but also for the various sides of the country. This preparation is also beneficial.

For the country, if it can be determined that the technology of the nuclear fusion reactor power station is mature and available six months in advance, then the relevant policies and adjustments to the market can take more than half a year of preparation time, because the technology is not sure When it is mature and usable, the action cannot be done too much, or if the experimental technique fails, then those adjustments will become troublesome.

Lei Tiantang directly asked the energy company to demonstrate the reactor on the one hand. On the one hand, he was confident in the fusion reactor technology developed by himself and Kuafu. On the other hand, it was also considered from the company's interest.

You should know that the companies and factories that the Infinite Gravity Group has completed and put into production and the projects under construction are all large energy-consuming households. Even at the scale of the Infinite Gravity Group, everyone is whispering every month when paying electricity bills!

You need to know that the company’s electricity is charged according to the standard of industrial electricity. The price per kilowatt hour is between 8 cents and 1 yuan. The average price is 3 months at the end of last year. The monthly electricity bill of Infinite Gravity Group is as high as 200 million RMB and a little more!

In other words, the electricity bills paid in three months must be one hundred million US dollars, such cost can be accepted, but the company uses so much electricity every month, the pressure on the government is not small, The electricity load brings a large burden to the line and power distribution.

In order to protect the power demand of the Infinite Gravity Group, the Hefei City Government also specially asked the power company to pull a special line for them and installed several high-power transformers.

However, as the scale of Infinite Gravity Group becomes larger and larger, these preparations of the government will soon be unable to keep up. Let's talk about other things, let's talk about the Interstellar Times Research Institute under high-speed construction!

After the super-large Hadron Collider was built, the electricity required to open a machine for an experiment was more than 10 million degrees, and it still consumed electricity in a short time. This has stricter requirements on the power grid!

There are also supercomputer units that are rapidly expanding, closed ecological farm laboratories that are under construction, etc. are all large energy-consuming households, and there are other construction projects. When these things come online this year, the infinite gravity group is just The monthly electricity consumption can reach more than 300 million kWh or even higher!

Electricity bills come out of the gravity group, but the power grid can't afford it!You know, even if it is the hottest last summer, the electricity consumption of Hefei City for one month is only nearly 4 billion kWh!

Now your company's electricity consumption will occupy about one-tenth of a city's electricity consumption in a month, and the grid will certainly be unbearable during peak electricity consumption.

So if the company builds a power station for itself, and then pulls a dedicated line to supply power to the company, then it can be used as much as you want!

With the scale of application for the nuclear fusion reactor power station constructed this time, even if the infinite gravity group can do it again, its electricity consumption is only a fraction of the power generated by the reactor, and the remaining points can be used at very favorable prices. If you sell it to a power company, you won’t lose money even if you sell 1 cent of the once-infinite gravitational group. After all, this reactor is mainly to ensure the company’s later electricity safety, and the money is made incidentally.

Such cheap electricity can at least benefit the entire Hefei city and surrounding cities, and make the city's economic development faster. The benefits in this regard can of course be seen by the government, and the country is also ready to The experimental city for policy adjustment was put on the side of Hefei City.

The construction land for the nuclear fusion reactor has been prepared for a long time, and the initial work such as land leveling work has been prepared.

Although the safety of nuclear fusion reactor technology is much higher than that of nuclear fission reactor, but there are still dangers, so this time the reactor construction location is not far from the company's rocket engine static test base, also in that small mountainous area.

The geological structure here is stable, and no major earthquakes have ever occurred, so safety is still guaranteed, and the nearest military area here is only 5 minutes of helicopter voyage, minimizing the possibility of human invasion!

A general-scale intrusion security company can prevent it, but what if other countries adopt a scale-scale intrusion at no cost?This kind of thing may not happen, but the preparations for sitting still have to be done. After all, this possibility is not great, but it is not without it.