I plant a field in the last days
Chapter 9 New House Design Plan
In the past few days, Lu Yuan has been busy collecting and delivering lobsters. Unknowingly, dozens of king crabs and Australian lobsters have been out of the boss.
Holding a half-meter long Australian lobster weighing 20 kilograms, Lu Yuan tremblingly came to the Yangfan Seafood Hotel where he had delivered watermelons.
As soon as he walked in, the lobster in Lu Yuan's arms attracted everyone's attention.
The hotel people also found Lu Yuan the first time and invited him into the seafood room.
"Twenty thousand! I'll take twenty thousand!" Some bald purchasing managers dragged the lobster with trembling hands and kept looking.
Haha, Aolong weighing 20 catties is already considered the best, and the other party is not aware of the goods at such a small price.
Seeing Lu Yuan who was about to take the lobster away, the other party was anxious.
"Don't don't don't, brother, it's good to discuss, I'll add you more, thirty thousand!"
"Fifty thousand one? That's okay! The deal!" This is still like human words, the 20,000 just now is indeed less, Lu Yuan nodded in satisfaction.
"Ahem! Brother, you made a mistake, I said an increase of 10,000 yuan, and I will give you 30,000 yuan!" The other party's face is black, how can there be such a price increase, this is not an old pit in Myanmar, and this lobster It's not jade, how can the price increase like this!
"That won't work. The auction house auctioned before was much smaller than this. Mine is at least 50,000 yuan! I will sell if you want it, don't let me go!"
Finally, the other party succumbed and took out fifty thousand to buy this lobster, and when he left, he also ordered that if there is any top-quality seafood, he can continue to send it.
however……
Less than two hours later, Lu Yuan came back and rented a freezer car, which was full of seafood.
"This... brother, you play with me! You have so many you don't say it earlier!" The blue veins on the purchasing manager's angry bald head jumped straight, and he almost jumped up and beat Lu Yuan.
"Uh... you didn't ask about this, so we dare not say it! Let's call it!"
"This can't be based on the previous price, let's take the normal price!"
Lu Yuan also knows that the larger the size of seafood, the higher the price. As long as it exceeds what you see daily, it is generally very expensive, such as bluefin tuna. It is said that an island country that has a good life has produced a fish worth tens of millions. tuna.
But if there are too many, the value will drop instead.
After some discussions, the seafood was sold at a price of 1,000 yuan per catty. The market price is generally between 300 and 500. The size of these Aolong and King crabs is obviously beyond the general scope.
Meizizi, 300,000 yuan has arrived. It seems that building a house is no longer a dream. Thinking of this, Lu Yuan picked up his mobile phone and directly dialed Du Heng's number.
"You can start, I will transfer you 300,000 yuan, you can go to purchase materials, and I will find a way for the remaining money!"
After Du Heng received Lu Yuan's order, he began to work overtime day and night to produce design drawings.
Although he didn't know why Lu Yuan built the house so strong, a good villa can obviously be built very luxuriously, but Lu Yuan's idea is to be as practical and safe as possible, so he has spent a lot of money. He has a meal every day. Apart from going to the bathroom, his desk is full of drawings. This is his first order. He doesn’t think about how much money he wants, but to prove himself. .
When he came to Du Heng's "decoration company", Lu Yuanyuan saw a greasy face and sourness Du Heng sleeping on the table.
"Ahem!" It was already three o'clock in the afternoon. I couldn't bear to see Du Heng look like this. It took three days to complete the drawings of a villa covering an area of 700 square meters. It was indeed a bit difficult for him. After all, his work The room is just him.
Hearing Lu Yuan's cough, Du Heng slowly got up, rubbed his eyes and said, "Oh, here you are, the drawing is ready! The construction can be done tomorrow, and I have contacted the construction party. Various things such as cement concrete wall tiles are also in place at any time, just waiting for your payment."
Lu Yuan was a little surprised. He didn't expect Du Heng to complete such a large amount of work by himself in three days. It was incredible!
Lu Yuan picked up a blueprint and looked at it.
"That is a scrapped picture, there are some minor problems in the middle, I will pass it."
"Uh... these are all?" Lu Yuan pointed to the drawings on the table and the sofa everywhere.
"Well, I ran out of A4 paper, so I did it directly on the computer. Come and take a look!" As he said, the other party stood up to catch the water and opened the CAD software on the computer.
Lu Yuan didn't care about the computer desk full of instant noodle soup and sweaty desks and chairs, and began to check every place carefully.
I have to say that Du Heng's level is quite high. He basically met all the requirements put forward by Lu Qian. The piles more than ten meters deep can better protect the house when an earthquake strikes. The entire house is It is reinforced with concrete and high-strength steel bars. The basement is carefully designed to prevent water and insects. It also has a double-layer insurance design. Just like a submarine, if the outer layer leaks, the inner layer is still waterproof, up to The three-meter basement allows Lu Yuan to store a large amount of goods, and the drainage system is quite in place. Even if it is flooded, as long as the double protective door is closed in time, the basement will not get water.
The above-ground building is a three-storey small building covering an area of 400 square meters, and it is also a one-piece steel-concrete structure. According to him, even if it encounters an eighth magnitude earthquake, it can be safe and sound, and the house wall tiles use a double-layer structure , Each layer is equipped with a layer of thermal insulation wool, and the back part of the exterior wall tiles is also plated with a layer of lead film, and the radiation will also be minimized.
Lu Yuan planned to plant some fruit and vegetable plants on the outside of the small building. There is also a pond. The area of more than 300 square meters is enough, and the family can't eat much.
The first floor is divided into three areas. The first one is the place to live. It has five bedrooms, toilets, kitchens, toilets and storage rooms. The other is a garage. A five-meter-high garage is even large. The vehicles in the country can also be safely parked in it, and the remaining place is the entertainment and leisure area. This place allows Lu Yuan to plan freely. The area is only tens of square meters, which is completely sufficient.
The second and third floors are completely residential areas. There are more than a dozen suites on the upper and lower floors. Even if you come with friends and relatives, they are completely sufficient. There is even an observation deck on each floor, which is perfectly designed.
Du Heng walked over with a glass of water and continued to introduce: "I chose composite glass for all windows, which is comparable in strength and hardness to the bulletproof glass of the bank. The door is a composite door with an armored structure. The security is enough. , As well as the water circulation system, I suggest to use the German brand, although the price is high, but the water saving and water saving are absolutely first-class, even if the water is cut off, it can last for a long time, yes, here, I designed it There are two 100-ton reservoirs and a sewage pond. I suggest installing a water purifier on the sewage pond. The purified water can still be recycled, so there is no need to worry about domestic water."
"You said that you need an air purification system. I searched for some brands. There is a new foreign market product that is okay. The price is moderate. The most important thing is that it can effectively expel the toxic gases from the outside world. It is even equipped with air shower equipment. People who come back from outside need to go through the air shower to get in."
"The roof part uses solar power panels, which are highly energy-efficient, and more than 400 square meters of solar power panels can fully meet the electricity problem in the villa."
...