Infinite Black Technology Park

Chapter 589 Bridge Construction Site

You can search "Unlimited Black Technology Paradise Search Novels (www.soxscc.com)" in Baidu to find the latest chapters!There were a total of three chartered planes. One month later, the group headquarters went to the building. All the employees were taken away by Li Dong. At the moment, they fly to the southern country. This is the new round of team building activities. Kicked off the curtain.

First of all, their first stop was the Tengzhou Peninsula on this side of the strait.

The Tengzhou Peninsula and the southern country face each other across the sea. It has always been an important transfer station for the southern country to enter the mainland. This is also the only way from the southern country to the mainland.

Three or four hours later, they got off the plane and took a bus to the town nearest to the construction site. The place where the Cross-Strait Bridge was selected on the Tengzhou Peninsula was originally a large area of ​​primitive forest. One month of hard work by the troops has completely changed the landscape here.

The forests are gradually disappearing, and the transportation roads have been opened up. Due to engineering reasons, the hotel was also built in advance. In the future, it will become a multi-functional service area for drivers to rest temporarily.

Dozens of buses came to the small town near the construction site. Due to this project, the newly built hotel was very lively.

It is worth mentioning that there is really a Soyo Galaxy Express hotel chain here. It was learned that the group headquarters was about to carry out team building activities here, and the whole store was emptied at once.On the eighteenth-floor small high-rise, only the guest rooms on the first floor are still open. Everyone got off the car one after another and checked in with the assigned room keys.

Some of the remaining people were also scattered to other hotels in the town. The originally deserted town was suddenly a lot of lively.After a rest night, the employees began to unite activities the next day.

At this moment, Xiao Man had already gotten up, set off with the employees, and participated in the team building activities together, while Li Dong himself let the generalist drove to the beach two or three kilometers away to find Gapa.

It is said that Gapa has completely fallen into a state of madness this time, and has leaped on the project with all his heart, and has been stationed at the construction site.

When Li Dong learned that Gapa was in such a state, he felt very happy. Gapa devoted himself to such a state. It was completely different from what Li Dong had seen before. He used to think that Gapa was absent-minded all day long. If that's the case, it's really amazing.

The car quickly arrived at the construction site of the bridge. Li Dong thought about something important at the same time. He immediately asked the all-rounders to pull out the large metal milk tea cans that were already prepared from the trunk of the car.

"This is a reward for them, it must be enough."

After Li Dong mumbled a few more words, he immediately put on his safety helmet and walked to the construction site. The construction site not far away was very standardized and tidy, with unified engineering fences, closed and strict management, and a large construction nameplate stood at the door.

Walking into the construction site, Li Dong stood on the high ground and looked far away. The blue sea was in the distance, and the row of buildings near the shore was particularly eye-catching. It could be seen that those approach bridges had already been built. .

Only one or two months have passed. Li Dong couldn't help being dumbfounded by the progress, and the main bridge has already been pushed out of the water, and now it has reached the third pile.

The piling speed of this main bridge deck is extremely fast, and the deep trench in the middle part is in the state of staying cables, so this is likely to be the highest or longest cable stayed bridge in Dahua at present.Because there is still a two-way channel under it, which can be used by the huge ship.

Gapa learned of Li Dong's arrival, but he didn't know where he jumped out. When he saw the director, he was very excited. He immediately rushed forward and almost didn't pick up Li Dong. This guy's hands were really powerful.

"Director!" www.daomuxsw.com

"Gapa, it's been a long time since I saw you, miss me, see what I brought?"

"director……"

As soon as Li Dong waved his hand, the generalists behind him carried the prepared metal milk tea cans. The look in Jappa's eyes was absolutely stunning. His eyes were shining, and he wanted to swallow Li Dong.

Li Dong also slapped Gapa on the shoulder twice, and he immediately said: "Small, if there is no big problem, then I won't bother you."

"Director, don't worry, how could something happen? We work with 100% specialization, and the natural result is 100% good. How could something happen? And let's talk about the project this time. , But two other strong construction teams are co-constructing with us."

"Gapa, I didn't expect you to admit their skills."

"Yes, I have to worship the Buddha. They are more thoughtful than we think in some clever ways, and we mainly use hard work, that is, no matter how hard it is, they just use clever ways. These problems have been resolved, so now the respective speeds are also very fast."

"Gapa, the two sides work hard together. At this rate, I don't think it will be three years. It can be opened to traffic in one or two years."

The sound of Gapa haha ​​laughed, following the oncoming sea breeze spreading far and wide, Li Dong looked at the construction mooring ship in the distance, and his mood was not generally good. Now Gapa has also changed a lot.

Immediately, Gapayao pointed his finger in a direction on the opposite bank, and said, “Director, look over there. There is a prefabricated bridge slab factory. After the construction of the main body is completed, the prefabricated bridge decks will be laid. And this time The bridge paving equipment is provided by us. Compared with the existing bridge paving equipment here, the absolute efficiency is much higher, but it will not exceed your common sense, but more strength is used."

After that, Gapa immediately opened the stack of drawings in his hand and turned a picture over. The powerful red giant car, more than 400 pulleys and positioning wheels, can easily grasp the bridge deck like a giant tiger. On both sides, and move slowly forward.

There are jacks on it, which can transport the entire bridge deck to a distant place, drop it heavily and then connect it as a whole. Of course, it can also be directly fixed with the stay cable to become a part of the bridge deck.

But at this time, Gapa was a little bit awkward.

"In fact, the director should not worry about our construction schedule, but should worry about the quality of stay cables, that is, the quality of steel cables, because ordinary strength steel cables can no longer meet our requirements, and what we need now is greater Quality, stronger and supportive characteristic steel, so as to meet our needs.

It is said that those of them are urgently publicizing these things..."

Li Dong nodded, and he agreed with Gappa's concerns. Although the paper-based steel is now available, it is probably not that simple to actually make it.

"Wait, Gapa."

When Li Dong was mentioned by Gapa just now, a spark flashed in his head.