Monster Factory

Chapter 215 Chapter 212: Remove All Electrical Equipment

“When I first bought a shipyard here, the water at Longxi Beach was very poor. The whole bay is dead and you can't even find a fish. ”

“As for... the underwater dark springs? No, at least I haven't seen a sea surge. ”

“No dark springs?” Shun Shun Yun frowned: “There was a lot of pollution before, so why did the water quality in the bay get better? ”

“Mr. Ye, I'm sure you already know what's going on in Xiaoping Lake. ”

“We traced the source of the contamination to Kim Mei Chemical. They secretly built a sewer pipeline here, but we did a seawater sampling test and found that the water quality here actually met a type of seawater quality standard. ”

Speaking of Xiaoping Lake, Shunyun is somewhat depressed.

Most of the people of Zhongyun know about this embarrassment.

They took the lead for three months, and the result came in exchange. There will also be a sense of guilt on those with thicker faces.

Now Shunyun is somewhat afraid to return to Xiaoping Lake. He can't always lift his head in the face of the increasingly desperate eyes of the entire staff involved in rescuing Xiaoping Lake.

Ye Qing has been busy in the main assembly workshop for two days. Zhongyun TV station did not broadcast this, Ye Qing is not very clear about what happened over Xiaoping Lake.

Communicate with the company over the phone, and several managers will not gossip, and talk to Ye Qing about such non-work related matters, unless Ye Qing takes the initiative to do so.

Why do you look at Wu Shunyun now? What seems to be going on over there?

Looks like it's also related to Kim Mei Chemical...

However, the deputy mayor's doubts about the quality of the water in the Gulf have become good, Ye Qing can still answer.

“I govern the quality of water in Longxi Beach Bay. ”

Since the deputy mayor did not ask, Ye Qing would not be foolish enough to voluntarily reveal his resentment with Kim Mei Chemical.

“When the factory settles in Longxi Beach, it is naturally my duty and obligation to maintain the entire ecological environment of Longxi Beach. ”

“Our technicians tested the Longxi Beach seawater and found a lot of chemical contaminants in it. So we tailored a set of strong Ionization Waste Water Processing based on the chemical composition here...”

Speaking, Ye Qing couldn't say any more.

Because at this point, the deputy mayor, and the two people in the EPA uniform next to him, they all look like ghosts.

They were dumb wooden chickens, their mouths wide open, and they looked straight at themselves.

What's going on here?

Ye Qing remembers looking in the mirror. There is nothing on his face, right?

Everyone in the office, except Ye Qing, has a huge wave inside.

Did the owner of Longxi Beach say that he had purified the polluted water in the bay himself?

“Impossible!” EPA staff stood up, “Xiaoping Lake is heavily polluting chemical wastewater, Longxi Beach is no better than Xiaoping Lake. Such contaminated water can no longer be managed to meet a category of water quality standards. ”

Wu Shunyun did not speak, but his expression was telling Ye Qing that he and the EPA staff held the same view.

“Nothing is impossible.” Ye Qing asked him strangely: “If I can't do it, then why is the quality of the water in Longxi Beach, and you test it as a kind of water quality? ”

“That's the bottom of the ocean… or governance for a year and a half…” The EPA's people were overwhelmed for half a day and couldn't say a word.

“Mr. Ye, do you really manage the water here in Longxi Beach? ”

Deputy Mayor Jun Shunyun stood up and some of his excitement was out of control: "As you can see, we're in big trouble. The whole of Xiaoping Lake was contaminated by the waste smuggled by Jinmei Chemical Industry. We assembled relevant technicians from all over the city. After a day and overnight effort to cure it, the water in Xiaoping Lake remained unchanged. ”

“Yes!” Ye Qing admitted, sweating in his heart at the same time.

Was Xiaoping Lake contaminated or did Kim Mei Chemical do it?

“This...” Deputy Mayor Jun Shunyun was a little confused, and he suspected that he was suffering from a number of illnesses.

Reason tells him that this cannot happen, or that a miracle cannot happen within two days.

Sewage management is a worldwide challenge, not without, and it takes time. Even if Ye Qingzhen has better governance methods, a longer governance process is needed.

“Mayor, you have to calm down, you have to believe in science.” The EPA was a little rushed, professionally telling him that even if the waters of Longxi Beach were clearer, there would be no possibility of a miracle happening over Little Ping Lake.

“How can I calm down?” Deputy Mayor Jun Shunyun held his fist tight: “Three months of hard work and a loss of credit. ”

“Master Qiao, get someone to lift the strong ionization treatment equipment to the car and prepare some metal sheets to shield the water cabin over there.” Ye Qing-eye looked at the scene a little confused, and I couldn't explain it clearly for a moment and a half. Instead, someone should send the equipment directly.

Listen to the Deputy Mayor, the pollution over Little Ping Lake is not generally severe.

The mayor has come to the door, this face is naturally to be given, then let the strong Ionization sewage equipment go.

As soon as they heard about the strong ionization equipment, they were definitely distracted. They couldn't help but say hello to Ye Qing and went outside to look up.

Two men dressed like towers, dressed in work clothes, carrying a piece of equipment they had never seen, came out of the warehouse. They then returned to the warehouse and loaded the old metal sheet with a forklift.

The truck was gradually filled with bundled sheet metal, and they couldn't figure out what to do with the sheet metal.

This device, the EPA people look left and right, all have observatories like the roof of the observatory.

Just shrunk the numbers!

The semi-circular is ceramic and milky white on the outside.

Seeing this, EPA staff could not help but shake their heads with disappointment. They also think of it as a high-tech, ceramic membrane filter.

A semi-circular ceramic film case, though somewhat creative. However, dozens of ceramic membrane filtration stations on the side of Little Ping Lake were constantly filtered, and the filter tubes were replaced by a truck.

Electromagnetic generator enclosure for strong Ionization Waste Water Processing equipment, indeed made of ceramic, powdered metallurgical ceramic material.

Seeing here, Deputy Mayor Shunyun stopped talking.

Ceramic film filtration equipment does have some effect, but...

Without complaining that they had this idea, Ye Qing said it was strong ionization. But the outer layer of non-conductive ceramic material is easily associated with ceramic membrane filtration.

After all, strong ionizing evolutionary sewage, they've never heard of it. The long pollutant discharge outlet on that device is also easy to associate with the filtered water discharge outlet.

“Is there only one such device? ”

“Yes, we only have one. The cost of manufacturing this equipment is too high for us to build too much. ”

“Mr. Ye, thank you for your kindness.” Wu Shunyun and Ye Qing shook hands. I wanted to say no to Ye Qing's kindness, but the two strong men like the tower over there were ready with the equipment.

shook his head, Shunyun and Ye Qing said goodbye, and rose back to Xiaoping Lake.

Along the way, Shunyun kept his lips shut.

When the two cars passed through the cordon belt pulled up by the EPA and returned to the temporary command office, the truck carrying strong ionization equipment and sheet metal also parked next to it.

Followed by a massive labor force and a master of ingenuity.

“No way, what's with this business, not even the ceramic membrane filtration accessories?” The EPA staff really don't know what to say.

The master skilfully jumped out of the car and looked directly at the staff of the EPA.

“Ask the forklift to help move that equipment down. ”

When Shunyun went to see the scene, he greeted the staff beside him.

The same ceramic membrane filtration technology, Shun Yun believes that the equipment of Beast Heavy Industries should be more effective than the one on the side.

Normal filtration equipment that filters out brown lake water like fresh tea, this one should be able to filter fresh water directly.

Unfortunately, there is only one, and if there are hundreds, there is not a single line of life.

Yes!

Better than nothing!

For this reason, Shunyun doesn't want to do too much.

The forklift carefully moved the equipment down, and the driver asked where it was to be moved, and the master of ingenuity told him to throw it directly to the water near the Blue River.

Once the equipment had been installed as requested by the master, he took a huge amount of hard work and a large group of unknown sideworkers to put a sheet of metal on the water cabins.

If it's a sticker, why don't you lean back. A sheet of metal leaned against the fence of the cabin and circled all the cabins.

When the master nodded satisfied, a black sedan quickly drove over.

The car was stable and Mayor Xia Yuming drilled out of the back row.

Now his mind is all over Little Ping Lake and he runs here whenever he has time.

Yet there was virtually no change in the water of the lake, making him more and more sinister.

“The report is ready.” Xia Yuming walked to the vice mayor, Shun Shun Yun, and lowered his voice: “But I did not dare to issue the order. As soon as this report is issued, all our efforts in Zhongyun City will disappear. ”

“Understanding - Our burden is too heavy, tormenting millions of people for three months, but asking us to announce our failure ourselves. ”

“Well, you all switched off your phones, people leaned away, and all the power equipment on the side was removed. ”

The master of ingenuity came over and shouted at the busy crowd.