Monster Factory

Chapter 1023: 1002: Unmanned

Naturally ~

Hardware improvements are simple, and it's hard to get users to fully experience the fun of power-back glove software.

In Ye Qing's thinking, the power feedback glove is a "key” to connecting virtuality to reality.

Before the product is put on the market, let's not say do the virtual piece right, but at least let the customers take care of the spectacular realm, the shock of virtual reality.

A few weeks later, the company's product R&D department made some improvements and temporarily set the power feedback glove at version 1.0.

In addition to significantly improving skin ventilation issues, the Power Feed Glove 1.0 specifically enhances gesture capture, adding wear resistance to palms, customizable glove appearance and other new changes.

There are also many software changes, and the biggest highlight is that it is well compatible with mobile and computer ports.

Bluetooth enables it to connect to mobile computers that are now available on the market.

Users can use it as a keyboard mouse, and it's convenient to use it as an over-the-counter mobile phone.

After weeks of effort, the Virtual Factory 5.0 was finally built at Longxi Beach Factory.

Ye Qing is now in the car production center of the factory's torpedo steam.

The Thunder Production Center is one of the biggest changes in all the factories in the factory.

More than a hundred monster workers are needed here before they can be transformed.

But this workforce figure is already a miracle in countries' automobile production bases.

Even the Wolfsburg Volkswagen line, which is said to be the most automated, cannot control a third of the workforce.

Ye Qing and the crystal follow the steel ladder to the top of the production center, overlooking the entire production center from top to bottom.

Before the transformation, Ye Qing frequently came here and placed every important industrial equipment in the heart.

After the transformation, Ye Qing observed for a moment, and felt that there seemed to be neither much change here nor much change.

For example, in Ye Qing's field of view, hundreds of pure white “incubators” seemed to persist.

These are “weapons of mass destruction” in the automotive industry.

Within each “incubator”, multiple sets of precision mechanical arms are integrated with no less precision than a five-axis processing center. The frame of the torpedo car is automatically fed into the "incubator” and then the various parts required by the torpedo car are quickly and accurately mounted on the frame by the robotic arm.

From the wiper, to the inside console, to the steering wheel, but small car parts can be installed automatically here.

Ye Qing's most memorable hundreds of devices remain unchanged, and the auxiliary devices around these devices can vary greatly.

Originally, although highly automated, drilling, winching, welding and precision stripping, these blinking moments were complete. At the same time, the mechanical arm clamps the parts needed by the car and secures them in an orderly fashion to the frame.

However, these parts are not fully automatic, and the automotive parts available on hundreds of “incubators" are concentrated in parts supply workshops further afield through the drive track.

Parts supply workshops need to employ more than twenty monster workers who need to manipulate special fixture equipment and move hundreds of parts of the same type onto the track at once.

Now there is no one in the parts supply workshop, parts are not grabbed with clamps, grabbing hundreds at a time.

It has been transformed into a magazine structure, each part loaded like a bullet, one by one, into an import track.

Back to the warehouse of the parts, also by fully automatic machinery, complete the process of sorting the parts and importing the parts cartridges.

Finally, the part cartridge is precisely propelled into the interior of the importing device. Whenever the parts in a part cartridge are used up, the robot hands forward and takes out the part cartridge and puts it into the rail car for the next input and export cycle.

It's easy to say. Why is it so difficult to do this?

Originally, a minefield production centre was set up, and the monsters produced an energy "incubator”, but there was not a very good solution to the problem of fully automating the supply of spare parts.

This is not a problem that can be solved by tailoring a part sorting machine.

Unmanned means the entire part sorting supply step, which must be done in a five-axis processing center, with no difference in precision.

Vibration occurs when parts move. The same occurs when you put it down.

Mechanical arms or clamps can also cause errors during work. These errors become larger and larger as each rail is repetitively positioned

To fix errors, monster workers have to fix these devices with high frequencies. Once the equipment enters the correction mode, work stops and production is delayed.

This is an unsolvable technical difficulty.

The advent of Virtual Factory 5.0 replaces the monster workers fixing equipment.

The sensor automatically records the equipment's work data every time, and the virtual factory automatically analyzes whether there are errors based on these data. If it does, it will take over the driver of this device and let it automatically correct the error the next time it works.

This is true of a component disassembly supply facility, as well as a hundred lightning “incubators”.

This is true of all equipment at a lightning production centre, as is the entire Longxi Beach plant.

“I remember watching a science fiction movie back then, and the robotics factory in there was just like ours.” Ye Qing's eyes were glistening and his body was filled with pride.

“May I ask the movie's name?” I am also proud to host the crystal for Virtual Factory 5.0.

“Terminator. ”

“I've seen it, but it blows too much inside.” The crystal whispered, "Can't even build a spaceship in there, bragging about making a time machine? ”

“Do you think time machines can be built?” Ye Qing asked with a smile.

Whether it's bullshit or not in the movie.

Ye Qing can only say that today's giant animal industry has reached the limit of the imagination of the future factory by relying on the current level of industrial science and technology. Even the robotic factory inside the Terminator doesn't have to be advanced here in Longxi Beach.

Look how the robot armor inside is made. It's actually molded in a metal furnace.

In exchange for the giant animal industry, it must be the spraying sand mold technology, printing out the mold, and then the powder metallurgy is monobloc.

Fully automated and full-bodied.

“Boss, don't think about it.” The crystal shook its head, "the time machine is a pseudo-proposition, let alone us, and the aliens will never make it. ”

“If you can't make it, can't you really make the world line? If someone goes back in time and leads me astray from my childhood, where do I make sense? ”

Ye Qing patted the crystal shoulder, “Go ~ Let's visit the next factory. ”

With the departure of Ye Qing and Jing, the Disaster Mine Production Center also opened the first production work after renovation.

A hundred “incubators” were activated simultaneously, and equipment indicators for all production phases lit up almost at the same time.

No monster workers can be seen here.

It has dropped sharply from over a hundred workers to ten today.

Five master craftsmen, two hard-working men and three electronic envoys.

This is a hardware maintenance team that is responsible for hardware repair and maintenance.

After all, this job is irreplaceable in virtual factories.