Red Alert Somalia

Chapter 173 Unupgradable Naval Unit

ps: 405 monthly tickets plus more.

——————

Shipyard:

Production of naval weapons units, construction price-1,000 base funds, covering an area of ​​one square kilometer, and the construction time required 168 hours.

Description: It can produce all naval weapons and equipment, ships, and various auxiliary warships and civilian ships.However, large amounts of base capital and electricity will be consumed during construction and production.

There is a dry dock inside, and each shipyard can only provide construction and maintenance services for one ship.

Special note: Having multiple shipyards does not increase the speed of ship building, but it can start building multiple ships at the same time.When repairing and maintaining warships, no materials will be consumed, but base funds will be greatly consumed.And the shipyard under construction cannot provide maintenance services for other warships.

Suggestion: If you want to quickly own your own navy, if you want to sail in the deep blue ocean, please prepare enough base funds for it.Because no unit can consume funds at a rate that can match it.

The vast ocean, from blue to turquoise, is beautiful and spectacular.People are always used to linking the word "ocean" together.However, the ocean is the central part of the ocean and the main body of the ocean.The sea, on the edge of the ocean, is a subsidiary part of the ocean.A navy in the true sense is an ocean navy.

In the past two months, after completing the construction of the air force base, Li Lan has been building a fund recovery mechanism according to the standard of the 13th model. Until half a month later, the fund growth rate at the base has reached 2.4 million. , Began to choose to build a shipyard.

For the base fund income of 2.4 million yuan, Li Lan only collected 1.8 million yuan a day. He refined and stored the rare mines and gold, silver and diamonds.Today is the day the shipyard is completed.There are still four months to complete the construction of the weather controller.

In the next four days, Li Lan needs to build a nuclear power plant as soon as possible, because the surge in electricity consumption throughout the territory can only maintain the regular supply of electricity, which cannot meet the consumption of the weather controller.

Due to the longer construction time of construction units, the development speed of the base has not increased. Except for the production of weapons and equipment, other aspects of construction work have been maintained at a just right situation.

The shipyard, like the Air Force Command, is an essential unit for building the navy.Li Lan's dedication to the navy is greater than that of the air force, because he needs a true ocean navy.

As for the naval units given by the base, Li Lan only had deep expectations, because each of them looked so powerful.

Sea scorpion:

Basic naval combat unit, construction price-3 million, construction to service time-two months.

Explanation: This is the most basic offshore defense combat unit of the Navy. It is all modularized production and has the most basic anti-ship air defense capabilities. Due to its small displacement, it is not suitable for ocean operations.But it can cooperate with land-based aviation in the offshore area to maintain regional air defense and offshore anti-ship missions.Its duties are mainly embodied in tasks such as offshore patrol, escort and fishery protection, and safeguarding sovereignty.

Simple data: a full load displacement of 2,000 tons, two modular eight-unit vertical missile launchers, a 76mm single-tube stealth rapid-fire gun, a 30mm air defense phalanx, a maximum speed of 30 knots, two depth-water bombs launched It can launch deep-water missiles. The bow has active and passive sonar. It has stealth effect. It has a helicopter operating platform but no hangar.

Special note: Two eight-unit vertical missile launchers are its main weapon, capable of launching air defense, anti-ship, and cruise missiles.Equipped with sea and air search radar and fire control radar.Due to the very high level of automation, only 68 personnel are required.

Suggestion: Before equipping him with weapons, determine the type of task it will perform, so that it can exert the strongest effect.

————

Sea scorpion, this weapon unit, Li Lan is very familiar with. In the game, this is a naval unit that can not only defend against air but also attack ships and land. The main reliance in the game is that very magical artillery.

In reality, this is a very advanced light frigate, with many modern light protection features, in addition to basic stealth, it can also perform a variety of combat tasks.In particular, the two eight-unit vertical missile launchers gave Li Lan a bright feeling.

Putting a vertical launcher on a warship of only two thousand tons is very rare.Because there is too much to let go, and there is no need for too little.But the sea scorpion put two eight-packs at once, which means that it can carry 16 missiles at a time.

The light frigates available all over the world are only equipped with four dual-mounted vertical launchers at most.Regardless of its tonnage or displacement, the sea scorpion is already close to the displacement of an ordinary frigate in the last century.

Coupled with the firepower that can hold down all the light guards in the world, in this region of the Middle East, such a frigate can only be compared with the UAE Bayunna-class frigate.

However, the construction time of two months made Li Lan look a little depressed.It takes two months for a sea scorpion, but think about how long it takes for the ships behind.Fortunately, shipyards and tank factories are completely different, because shipyards can build multiple warships at the same time.

And the time to build a shipyard only takes one week.As long as the power issue is resolved, he can begin large-scale naval construction.

The Army and Air Force do not take a long time to build, but they have to line up, while the Navy has a long time to build, but there is no need to line up.

Because there is no military port yet, no matter what warship Li Lan builds, there is no suitable place to dock, so he can only anchor and place it next to the shipyard, and there are crack generators covering it.

In this regard, Li Lan is also cautious.In order not to attract the attention of other countries, the shipyard was built north of the air force base, close to the seaside land of the Gulf of Aden, because it is a dry dock and does not need to be built on the water.The shipyard was also built by the sea, just within the range of the crack generator.

Under the action of the crack generator, the area seemed to others to be just a somewhat huge building, and it was impossible to see what was inside.

However, Li Lan didn't dare to be careless. Two battalions were stationed next to the air force base and the crack generator. The defensive weapons produced in the past two months were also placed there first.

Fortunately, due to the secret agreement signed by various countries, the reconnaissance activities here have been greatly reduced, and U.S. drones have never approached here.Basically, I only took a few photos with satellites in half an hour, and I didn't have to do the same as before.

Li Lan, who was waiting at the console, did not choose to build sea scorpions and other surface warships after the completion of the shipyard. Apart from the fact that there was no port to dock, he did not want to build a warship that could not go to sea.As soon as the sea scorpion leaves the range of the crack generator, it will soon be discovered by various countries, and the situation will be broken by then.

Now Li Lan was not ready at all, so after taking a look at the Sea Scorpion and other warships, Li Lan focused on the submarine.

But this submarine has some problems, at least Li Lan looks very problematic.

After the typhoon submarine opened, three different icons appeared.Typhoon conventional power submarine.Typhoon attack nuclear submarine, typhoon ballistic missile nuclear submarine.And the ballistic missile nuclear submarine is still a gray icon and cannot be built.

He didn't rush to watch the specific performance and data. He just glanced at the price and construction time that would make anyone's head big, and then asked his assistant: "Assistant, what are the three icons in the Typhoon submarine? "

"This is because the base has subdivided the submarine in order to allow the commander to have its own submarine force faster. In fact, this corresponds to the three levels of the typhoon submarine. At the same time, the base also deprived the commander of the upgrade of the remaining warships. The entire navy In the series, only submarines and aircraft carriers have three grade icons, and the rest of the naval units will no longer have the ability to upgrade. Only after the commander’s R&D team has formed and has R&D capabilities, can newer warships be designed and built."

Li Lan did not rush to understand, but clicked on the aircraft carrier construction icon. As always, three icons appeared. Like the typhoon ballistic missile nuclear submarine, the last icon was in an unbuildable state.

"In other words, apart from the already divided submarine and aircraft carrier, can other naval units not be upgraded?" Li Lan frowned and asked.

"Yes!"

"Then since this is the case, don't I have no equipment lead at all?" Li Lan continued to ask.

"But commanders can have the same advanced level of equipment, and in terms of electronic systems, commanders have considerable advantages. At the same time, it is not to say that the weapons and equipment owned by the commander will not have next-generation products, but the base will not Just provide it again. The commander needs to recruit a group of research teams, and then research and develop on their own. As long as they can be approved by the base, they can produce and upgrade the products. Or, the commander does not need to go through the base and worry about a sufficient number of engineers. And skilled workers, making them manually in the shipyard."

"What about land and air units?"

"The land and air units can be upgraded, and the commander can also ask the research team to study new weapons and equipment. Similar to the naval equipment, they can build themselves or they can be completed by the base through the approval of the base."

The assistant's explanation was very clear, and Li Lan quickly understood the meaning of the base.Except for submarines and aircraft carriers, other naval units will not be upgraded automatically, even if they are built in the next few decades, they will remain unchanged.However, the performance of these units can be improved through the R&D team, and a piece of equipment that can be approved by the base can also be designed and added to the construction list.