Skynet Architect

Chapter 222 Trial Run

When they arrived at the construction site, there was already a huge temporary warehouse nearby, which was prepared for the road construction.There were dozens of people sitting in chairs waiting quietly in the warehouse with bright lights.But if someone watched it up close, they would definitely see their fingers plugged into a dedicated socket.

Quietly charging.

Most of these Terminators are T300 type Terminators. A small number of T400 Terminators have performed a lot of tasks in the previous period. Now it is understandable that they are charged and recharged.

Song Yang quietly looked at the people in front of them and exclaimed: "Your workers look like soldiers. They are always so meticulous. This puts a lot of pressure on their hearts."

The prince beside him nodded in agreement.

Only Si Fan looked at them strangely, his eyes full of weirdness.

"What are you two doing here? Is there nothing to do?" Si Fan asked.

Two people were taken aback at the same time.

"We're waiting for you to start construction. Let's see how your construction works. I haven't seen how such a large machine works. I have learned more about high-end equipment in developed countries. But such a large-scale equipment is really not seen. How many have been there." Song Yang said in praise.

The prince beside him looked at Song Yang with contempt, but still nodded.

Si Fan glared at them.

"During the construction, you can only look at it from afar, not close, and the construction speed will be too fast, don't hurt you, a rich second generation, a prince, if it breaks down, I can't afford it!"

After speaking, he yelled at the Terminator opposite, and immediately saw that all the Terminators stood up and lined up to accept Si Fan's review.

"Start construction, and design according to the previous blueprint. Plant transplantation is placed at the end, and the previous process is completed at one time!" After Si Fan arranged it, he immediately saw the Terminators scattered and rushed to the huge front like an army. Behind the construction machine.

The T707 road trailblazer Terminator weighs 120 tons, and it looks so huge in the desert at this time.Si Fan is still worried now, it is not accidental that this huge Terminator can appear here.This is the working capital of Sifan's company, the money from selling the entire European Garden, plus all the company's funds and their original capital.

Even so, Si Fan still owed a bank loan of 500 million yuan, which was beyond the limit that Si Fan could bear.In order to make this highway the first shot.Become the only solar road contractor in the world.

Are you afraid that no project can be done?By then this Big Mac will be an old hen who will lay golden eggs.

After Si Fan gave the order, he dragged two people into the shed just now, and a dozen large trucks were being driven by the Terminator next to him.

"What are they doing? Why are they constantly transporting things?" Song Yang asked Sifan incomprehensibly that there were no plans that could be seen before the construction of this highway, and no one even got the roadbed in advance.How is this to be done?He had no idea how exaggerated the T707 road trailblazer in front of him was.

According to his understanding, a highway is contracted by sections, even if it is not contracted according to the sections, it is also built according to the sections, but the current situation is different.It seems to be making a fuss around this huge machine.

They all had a black eye on what this article was about.

Only Si Fan is a bit bitter. The current start of work is not a formal start, but a trial run stage of the machine.

When the construction is officially started, there will be a lot of professionals such as supervision engineers and surveyors nearby...visit.

That's right!They can only visit.Because the road paving in front of them will definitely break all their conjectures about road construction.

"Let's watch it now. Let's start construction for half an hour to see how fast the efficiency is. By the way, take a reassurance to His Royal Highness so that you don't feel so nervous." Si Fan pointed to the road ahead.

"If you want to build a road, you must first lay the roadbed! This roadbed is the foundation of a road, but we are different. All the equipment is completed at one time, including the solar power generation equipment, but the installation of this equipment is in a state of confidentiality. It is not allowed to visit. "Si Fan explained.

In such a short time, the prince next to him suddenly said.

"You just said that the road needs a roadbed? How can you do it all at once?" the prince asked.

At this moment, I saw the huge equipment that looked like an all-metal bellied truck suddenly protruding countless heavy tools, and the ground seemed to have gone through a storm.

The entire soft semi-sandstone structure ground was turned over, mixed with a lot of other materials, changed the quality of it, and then completely compacted!There is absolutely no hesitation!Before tamping, there was actually an underground pipe directly inserted five meters underground!In the future, various wires such as cables and optical fibers can be connected.

This is a very exaggerated efficiency. It should have been done in one project. The T707 road pioneer has been advancing on the Z-shaped route, and every piece of the road has been processed.

The prince and Song Yang were dumbfounded.They really don't know what this machine is doing so loudly.And when working, white gas is often emitted, and no one knows what this gas is.

But they will know soon.

After ten minutes, they looked at the road in front of them incredible.The road has actually been completely built. The roads that people usually see behind T707 are the roads that people usually see, but these roads are a bit different. On the roads in front of them, there are some dense grids, as if there are metal inserts. Under the highway.

The road on the pavement does not look as rough as the previous road, but the details have changed!After a special process, it has strong friction.A large number of slopes of the highway here have a smooth visual appearance, which seems to have undergone special treatment.

The highway has eight rows of straight lanes, four in reverse, which is quite normal, but there is a transformer box buried deep in the ground on the side of the starting point of the road.

Nothing else.The simplicity makes people feel as if they are on a more unique and creative highway.

However, Si Fan explained the answer to them.

"There is a socket for connecting cables five meters underground. This socket can be directly connected to the main power supply cable to output power. It can also be directly connected to the power reserve components of the solar power station, so that the power station in the The battery pack caches power to ensure 24 hours a day power supply.” Si Fan explained.But for this power station equipment, that needs additional construction.The core technology is actually a battery pack with sufficient cache capacity.Si Fan really doesn't have this thing now!