Trillions of market capitalization is not a dream
Chapter 218 Bay Project Report
After Song Zhiyuan swept the venue, then he said: "You think, that is, it is impossible to achieve it. So the project department is called to the business department, in addition to understanding the problem, but also provide a few Solution, every solution is clear, what is going to be clear, the concise summary, don't engage in a long story. The leaders are very busy, how can I have time to study your report content and questions? The meaning of the outside. Your report needs to be clearly said. "
Zhou Cheng Shao, Xinda New and Golf Project Manager, said after the comment: "Dongshan new and golf project, the earth's earth existed, this year, the earthwork is starting, but people are not working, waiting for price increase Afterwards, later came to July 8, after many negotiations, the collection is carried out. The slope style of the site is completed by the project department's personnel to adjust the machine.
There are three people in the past, there are two people entering five hundred cubic meters. The other can only get about seven, eight hundred cubic meters per day, and it can reach a thousand cubic meters. The entry speed of the earth is still seriously related to the demand for project construction progress.
There is also a problem in planting grass. Since the new winter weather is cold, the lawn designed now is getting more than the winter, and it will die in the winter lawn. In the coming spring, the spring will still need to rebound, which will additionally increase cost. Coordinating the design to change the lawn variety suitable for cold weather regions.
At the end of November of Dongshan, there is a frozen layer. Ask you what to do in advance to solve the bar supply problem in advance.
After the foundation of the civil engineering pump room, there are also about 80,000 cubic meters of the powers to enter, it is recommended to increase the team supplied by the bar.
The implementation of the discovery of the land is the implementation of the greening project. At present, the grass is already suspended, and there is still a lot of grassseeds that have been purchased, and there is no way to continue.
The waterproof time of the landscape bridge is very long, the water is circulating, and the river has no way to break. "
As the high-level manager of the seedlings system, Bai Jianwu was invited by Song Zhiyuan's guest in the form of this meeting.
Bai Jianwu gave Wengcheng, Xinhe Golf Project Manager Zhou Chengdu: "Sending the remaining grass seeds back to the company, I arrange the project department used in other available."
Zhou Cheng Shao, a golf project manager, Dongshan, and the golf project manager Zhou Cheng, promised: "Okay. White, I will arrange this work later."
The west of the practice field entered about 10,000 cubic meters, 33% area, need to be grab as soon as possible.
The seedlings of the practice farm can only allow a car to enter or out, unidirectional, non-two-way construction through severely affecting the construction progress and construction efficiency.
The total output value is 52 million, and the total output value has been completed, and three million project costs are completed under review.
Basic balance of payments, September's progress has not yet been grouped, and gross profit is basically guaranteed. "
Tong Ling, deputy chief of production: "The effect of Dongshan New and Golf Project is now due to cost reasons, no guarantee. The middle and low level of green design is defective."
The deputy head of the production of the new and golf project has been managed: "I am more familiar with golf. Requires for breaking the trees early or a false tree, worrying about the cause of the passage, Joe will not enter the site.
Slug grass is in front of the information, we will do herbicide. The South China Sea has a project golf, that is, there is no weeding treatment. One month sent two hundred people to the grass, and they also filed. There is also increased costs and still fall in person, and humble.
Song Xiaoshan, the production manager of Qiongshan Bay Project Department, said: "Bay Bay Project in Nanhai, about 100,000 square meters, 34 million output value, cost is about 2,0 million, beyond the signing gross profit 20%, only optimized The configuration has increased gross profit 8%. The settlement book Party A has already identified, and the company is returned to the corporation process.
From September 30th to 8 October 8th, it was rushed to trenches in more than ten times in the scene, and the hard base was restored.
This part of the recovery settlement is a thousands of two million, striving for a thousands of millions of thousands of million, this part has been communicated with Party A, which will be handled separately after recovery.
Quality: Art Director has repeatedly adjusted on site, and the owner of the community is very satisfied with the art.
In style, the subject is not clear enough, and the artistic director is replaced too frequently. Party A is more disturbed and does not discuss with the construction party.
Project cost and profit analysis:
1. Gardening materials, information prices, admittes, land prices lag, low profits, and the profit is very low.
2, the main entry into the planting soil is abnormal, the seedling is low, and the gross profit margin of the project is low.
3. Because the landscape effect is not up to the standard, I remember that the largest place has eight times, increasing the cost of labor, mechanical cost, and reduces the survival rate of seedlings. Feedback from the total adjustment of solo Ling Yun is best. "
After the Song Ziyuan said, he commented on the words: "The Phase I of the Bay Project of the South China Sea is planning.
The project team has seven people, maintenance, and post-disaster recovery are doing well. The project department organizes all people to go to other good sites to learn advanced experience, and they have been rated as the worst team, but they have been trying to learn, hard work, keeping themselves, Xiaoshan told me, they never think of themselves Is the worst team. "
A laughter was sounded.
Song Yuanyuan continued to review Song Xiaoshan's statement: "After a period of this process, the settlement personnel have a big improvement, which is worth a good thing."
Song Xiaoshan, the production manager of Qiongshan Bulf Project Department, continued to speak: "The recommendation on the second phase of the project: half of the construction range or one half is no reason to refuse, too small should refuse, half of the words are about 50 million.
Phase II:
1, the construction period may not be robbed, requiring the completion of November 9 next year.
2. Observe that Party A has learned lessons, there will be improved and improved.
3, the return is relatively timely.
4, production, and art team will compare the project.
5. Popularization of the South China Sea Market has positive significance.
About the second phase of the project and Party A communication:
1. Multi-Party A-Class A period requires a period of time, talking, the previous part of the production example will not participate.
2, require Party A directive to be written, and verbal can be performed first.
3, the effect must be based on our artistic director, this is proven by practice, and our level is obviously higher.
Suggestions on the management of project department:
1, hard, soft view forming a unique style of Western architecture, I have come to the company in September last year, are familiar, learning.
2. Establish a project management incentive mechanism, deputy general, project manager confirmation.
3. Develop the South China Sea, it is recommended to build a nurser of Nanhai as soon as possible. "