Trillions of market capitalization is not a dream
Two hundred and thirty-seventh chapter to find a calculator
Bai Yuting heard the report of Song Yuan, said: "The Bay 701 Hospital's candidate will first press the bidding and construction drawings, report the gross profit margin, first let me know about the probably, and then tell each other. Adjustment of tendering construction drawings, convenient for me to understand the project information more convenient. "
Song Zhiyuan: "Okay, white. That's below, Lin Yiping reports the gross profitability calculation document of the Gulf 701 Hospital."
Bai Qingting paided the Song Dao Road: "Slightly, Song, arrange people to find a calculator."
Lin Yiping wrote that after listening to this saying: "There are two calculators on my station, I will take it right away."
Lin Yiping ran to his own position, brought back two calculators to the conference room, one to Bai Qingting to give her, and the other left her own back.
Bai Qingting arranged: "Xiaolin, you can start reporting the gross profit margin."
Lin Yiping took the gross profit margin of the Garden Landscape Project of the Garden Landscape Project on the computer, and adjusted the sharpness of the projector, and then reported: "Dear leaders, everyone is good morning.
Below you will report to you the gross profit margin of the Garden Landscape Project of the Gulf Gulf, and the documents seen on the projection are the status of a segment.
A branch is cost 65 million yuan, and the offer is expected to offer 10 million yuan, and the price gross profit margin is 35%. "
Bai Qingting asked: "Xiaolin, how many square meters of construction area of the entire section segment?"
Lin Yiping replied: "White, the construction area of the first section is 20,000 square meters."
Bai Qingting asked: "How much is the cost of single square meters, how much is it expected?"
Lin Yiping replied: "The cost of single square meters is 325 yuan, and the offer is expected to be 500 yuan."
Bai Qingting: "The grade of this price is not high, the art department should pay attention to the low price of this price, to come up with appropriate countermeasures."
The art master replied: "Okay, white, our art department has prepared some programs, waiting for us to report in detail."
Bai Qingting said: "Okay, what should you do this? Xiaolin you continue to report."
Lin Yiping continued to report: "The cost of the earthwork is 5 million yuan.
The government construction project cost is 25 million yuan, the greening project cost is 30 million yuan, the hydropower project cost is 3 million yuan, and the total cost is 2 million yuan, with a total cost of 65 million yuan.
Let's take a look at the cost of the cost of the earthwork. This is relatively simple.
The amount of dosing in the field is 100,000, with a cost of 900,000 yuan.
Fill the planting of the plant of 100,000 yuan, cost 4.1 million yuan. "
Bai Qingting asked: "Please explain how the two cost unit prices are calculated."
Lin Yiping replied: "The cost unit price of the excavation in the field is 9 yuan per cubic meter, including the excavation, within 1km, the inner tunnel is 1km, and the backfill is mainly constructed.
The unit price of the excavation is 5 yuan per cubic meter. It is 1 yuan per cubic meter in the field, and the backfill is considering 3 yuan per cubic meter. These unit prices are included in business tax. "
Bai Qingting asked: "How many excavators do you consider? How many cubic meters can you dig every hour? How much is the unit price of converted?"
Lin Yiping has already seeps the obvious small sweat beads, and I thought: "Oh, white boss, you ask such a thin, only hurry up and try to get the data."
Lin Yiping's thoughts have been reported after the report: "That is the case of the hook machine with the Cat320BC bucket capacity 1.0 party, his excavation effect: when working properly (including flat, loading, shift, refueling, short Rest, etc.), the excavator of the bucket capacity is dug 2 (1.5 natural party) per minute, dig 90 natural side every hour (the imaginary 120 party), if you work 10 hours a day, you can dig 900 daily Fang (inevitable 1200 party).
Dump trucks: 3 seconds to dig 1 bucket, each need to take 13 buckets (12-party car capacity 12), plus the change time is 420 seconds, when the vehicle is sufficient, 9 cars per hour, 117 Inexplicler (in 90 natural part), 1km tube in the field requires three dump trucks for each hook machine.
The backfill is made of bulldozer, which is flattened, and it is crushed with a flat roller. "
Bai Qingting asked: "" The unit price of these machines. "
Lin Yiping replied: "The hook machine calculates according to 2500 yuan, each naturally excavation unit price is 2.8 yuan per cubic meter; dump truck calculates 700 yuan per class, each natural fashion unit price is 2.92 yuan, bulldozer push Soil, the unit price of each cubic meter is calculated according to 1 yuan, and the single price of the flat roller rolling is 2 yuan per cubic meter calculation. "
Bai Qingting said, "Okay, according to your hook machine 2.8 yuan per square + dump truck 2.92 yuan per square + bulldozer 1 yuan per square + road machine 2 yuan per square = 8.72 yuan, with you The cost unit price of 9 yuan per square rice does not match. "
Bai Qingting continued to speak to Song Yuan: "Song, I know that your data is teasing, but your work should be serious, you can't make it unable to make it, right."
Song Zhiyuan explained: "White, although our cost data is in the ingredients of teasing data, the single price of this earth is to find supplier inquiry. The cost problem is also eight or nine, not related to it. . now calculates the data is a bit fine difference. I understand this is just a theoretical calculation value, which is slightly different from the reality, so her calculation data should be more accurate. "
Bai Qing Ting laughed: "Ok, you have reasonable you tell, but you will have a clearance, but you should strengthen the understanding of cost data. For those machinery, artificial and material cost unit prices must be cooked in the chest."
Song Zhiyuan: "Thank you for the premiere solution, spend a hundred years, Lin Yiping, the future cost measurement of the Ministry of Commerce should strictly implement it according to the overall instructions of white, and not hit the horse."
Holding a hundred years, Lin Qieping replied in the venue: "Well, good."
Bai Qingting continued to say: "The cost unit price of replacing the plant is 41 yuan per cubic meter. How did this measure?"
Lin Yiping thought, fortunately, I discussed yesterday, so I am very confident: "Cost single price calculation of the cultivation of the plant: First, buy the planting of the pot car is 20 yuan per cubic meter, the car is compressed into a substantially 1.4 cubic meter In order to compute into 1 cubic meter, 20 multiplied 1.4 equal to 28 yuan per cubic meter pressure.
After planting the earth, it is necessary to generate the shipping cost of 3 yuan for each cubic meter, 28 + 3 = 31 yuan per cubic meter.
The backfill and coarse type are calculated for 3 yuan per cubic meter.
The management fee of the earthwork, the management fee, the profit, etc. is estimated to be 39.78 yuan per cubic meter.
Coupled with business tax and additional 41 yuan per cubic meter. "